AKUNTANSI BIAYA METODE BIAYA STANDAR -2

AKUNTANSI BIAYA METODE BIAYA STANDAR -2. STIE MANDALA 2008 M. DIMYATI Sumber : Manajemen Biaya , Hansen&Mowen , edisi 2. ANALISIS VARIAN BIAYA OVERHEAD PABRIK. METODE EMPAT VARIAN:

Download Presentation

AKUNTANSI BIAYA METODE BIAYA STANDAR -2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AKUNTANSI BIAYAMETODE BIAYA STANDAR-2 STIE MANDALA 2008 M. DIMYATI Sumber: ManajemenBiaya, Hansen&Mowen, edisi 2

  2. ANALISIS VARIANBIAYA OVERHEAD PABRIK • METODE EMPAT VARIAN: • VARIAN OVERHEAD VARIABEL  Totalvarian overhead variabelmerupakanperbedaanantara overhead variabelaktualdan yang ditetapkan. • Varian Overhead variabelpembiayaan (Variable overhead spending variance)  mengukurefek rata-rata perbedaanantaratarif overhead variabelaktual (AVOR – actual variable overhead rate) dantarif overhead variabelstandar (SVOR – standard variable overhead rate) • Varian Overhead VariabelEfisiensi ( mengukurperubahandalampemakaian overhead variabel yang timbulkarenapemakaiantenagakerjalangsung yang efisienatautidakefisien • VARIAN OVERHEAD TETAP  Total varian overhead tetapmerupakanperbedaanantara overhead tetapaktualdan overhead tetap yang ditetapkan,  overhead tetap yang ditetapkandiperolehdariperkaliantarip overhead tetapstandardengan jam kerjastandar yang dijinkanuntuk output aktual. • Varian overhead tetappembiayaan  (fixed overhead spanding variance) sebagaiperbedaanantara overhead tetapaktualdengan overhead tetap yang dianggarkan • Varian overhead tetapvolume  perbedaanantara overhead tetap yang dianggarkandengan overhead tetap yang ditetapkan.

  3. Analisis Varian Overhead Variabel Overhead Variabel Aktual Tngkat Overhead Variabel x Jam Standar Tingkat Overhead Variabel x Jam Aktual Varian Pembiayaan Varian Efisiensi Total varian

  4. Analisis Varian Overhead tetap Overhead T e t a p Aktual Tingkat Overhead Aktual x Jam Standar Penganggaran Overhead Tetap Varian Pembiayaan Varian Volume Total varian

  5. Varian anggaran overhead  merupakanjumlahdarivarianpembiayaandanvarianefisiensidarimetodeempatvarian. Varian volume overhead  samadenganvarian volume dalammetodeempatvarian ANALISIS DUA VARIAN

  6. AnalsisiDua Varian Overhead Aktual Tngkat Overhead x Jam Standar (SVOR + SFOR)xSH Penganggaran Overhead tetap + SVOR x SH Anggaran Varian Volume Varian Total varian

  7. ANALISIS TIGA VARIAN • Dalammetodetigavarian, variananggarandarimetodeduavariandipecahmenjadivarianpembiayaandanvarianefisiensi • Satuvarianlagiadalahvarian volume overhead

  8. ANALISIS TIGA VARIAN Overhead Aktual Penganggaran Overhead tetap + SVOR x AH Penganggaran Overhead tetap + SVOR x SH Tngkat Overhead x Jam Standar (SVOR + SFOR)xSH Varian Pembiayaan Varian Efisiensi Volume Varian Total varian

  9. ANALISIS EMPAT VARIAN: VARIAN OVERHEAD VARIABEL • AVOR = Actual Variable Overhead rate • SVOR = Standard Variable Overhead rate • AH = Jam kerja aktual • SH= Jam kerja standar • Total Varian Overhead Variabel= (AVOR x AH) – (SVOR x SH)

  10. VARIAN OVERHEAD VARIABEL PEMBIAYAAN (AVOR-SVOR)AH VARIAN OVERHEAD VARIABEL EFISIENSI (AH-SH)SVOR

  11. Varian Overhead Variabel Pembiayaan (VOVP) VOVP = (AVOR x AH) – (SVOR x AH) VOVP = (AVOR – SVOR) X AH Dimana: AVOR = tarip overhead variabel aktual SVOR = standar overhead variabel AH = jam kerja aktual

  12. Varian Overhead Variabel Efisiensi (VOVE) VOVE = (SVOR x AH) – (SVOR x SH) VOVE = (AH-SH) X SVOR Dimana: AH = Jam kerja aktual SH = Jam kerja standar SVOR = standar overhead variabel

  13. AFOH = Actual Fixed Overhead SFOH = Standard Fixed Overhead SFOR = Standar Fixed Overhead Rate AH = Jam kerja aktual SH= Jam kerja standar Total Varian Overhead Tetap= AFOH – SFOH Total Varian Overhead Tetap = AFOH – (SFOR x SH) ANALISIS EMPAT VARIAN: VARIAN OVERHEAD TETAP

  14. VARIAN OVERHEAD TETAP PEMBIAYAAN (AFOH-SFOR)SHd VARIAN OVERHEAD TETAP VOLUME (SHd-SH)SFOR

  15. VARIAN OVERHEAD TETAP PEMBIAYAAN (FIXED OVERHEAD SPANDING VARIANCE = FOSV) FOSV = AFOH - BFOH FOSV = AFOH – (Tarip Overhead Tetap Standar x Aktivitas yang diharapkan) Dimana : AFOH = Overhead tetap aktual BFOH= Budget overhead tetap

  16. VARIAN OVERHEAD TETAP VOLUME (VOLUME FIXED OVERHEAD VARIANCE = VFOV) VFOV = BFOH - ApFOH VFOV= (SFORxSHd) – (SFORxSH) VFOV = (SHd – SH) x SFOR Dimana: SHd = jam kerja pada aktivitas yang diharapkan SH = jam kerja standar yang seharusnya digunakan SFOR = Tarip overhead tetap standar

  17. Diketahui: Biaya standar Bahan baku langsung ( 2 kg x $5) = $ 10 Tenaga kerja langsung (0,5 jam x $10) = $ 5 Overhead tetap (0,5 jam x $2*) = $ 1 Overhead variabel (0,5 jam x $4*) = $ 2 Aktivitas yang diharapkan = 2.500 jam Jam standar pada aktivitas aktual = 0,5 jam x 6.000 unit = 3.000 jam Aktual: Produksi = 6.000 unit Overhead tetap = $ 6.000 Overhead variabel = $ 10.500 Bahan baku langsung (11750 dibeli dan digunakan = $61.100 Tenaga kerja langsung (2.900 jam) = $ 29.580 Diminta Varian overhead variabel: pembiayaan dan efisiensi Varian overhead tetap: pembiayaan dan volume ILUSTRASI ANALISIS VARIAN

  18. ILUSTRASI ANALISIS VARIAN OVERHEAD VARIABEL • VARIAN OVERHEAD VARIABEL TOTAL • Total Varian Overhead Variabel= (AVOR x AH) – (SVOR x SH) • Total Varian Overhead Variabel = $10.500)–[($4x(3000)] • Total Varian Overhead Variabel = $ 10.500-$12.000 • Total Varian Overhead Variabel = $ 1.500 (favorable) • VARIAN OVERHEAD VARIABEL PEMBIAYAAN • VOVP = (AVOR x AH) – (SVOR x AH) • VOVP = ($10.500) – ($4 x 2.900) • VOVP = $ 10.500 - $ 11.600 • VOVP = $1.100 (favorable) • VARIAN OVERHEAD VARIABEL EFISIENSI • VOVE = (SVOR x AH) – (SVOR x SH) • VOVE = ($4 x 2.900) – ($4 x 3.000) • VOVE = $ 11.600 – $ 12.000 • VOVE = $ 400 (favorable)

  19. ILUSTRASI ANALISIS VARIAN OVERHEAD TETAP • VARIAN OVERHEAD TETAP TOTAL • Total Varian Overhead Tetap = AFOH – (SFOR x SH) • Total Varian Overhead Tetap = $ 6.000 – ($2 x 3.000) • Total Varian Overhead Tetap = $ 0 • VARIAN OVERHEAD TETAP PEMBIAYAAN • FOSV = AFOH - BFOH • FOSV = $ 6.000 – ($ 2 x 2.500) • FOSV = $ 6.000 - $ 5.000 • FOSV = $ 1.000 (Unfavorable) • VARIAN OVERHEAD TETAP VOLUME • VFOV = BFOH - ApFOH • VFOV = ($ 2 x 2.500) – ($ 2 x 3.000) • VFOV = $ 5.000 - $ 6.000 • VFOV = $ 1.000 (favorable)

  20. SOAL LATIHAN • Diketahui: PT. Febian memproduksi makanan ringan yang dijual per kaleng • Standar per kaleng makanan ringan: • Bahan baku langsung (35 ons @ Rp. 800,- = Rp. 28.000 • Tenaga kerja langsung (0,1 jam @ Rp. 86.000,-) = Rp. 8.600,- • Hasil aktual selama seminggu: • Jumlah yang diproduksi = 5.000 unit • Bahan baku yang dibeli 185.000 ons @ Rp. 850,- • Tidak terdapat persediaan awal dan akhir bahan baku • Tenaga kerja langsung 490 jam @ Rp. 86.000,- • Diminta • Hitung varian harga dan efisiensi bahan baku • Hitung varian tarif dan efisiensi tenaga kerja langsung

  21. SOAL LATIHAN • Diketahui: PT. Febian menggunakan sistem biaya standar dan mengembangkan tarif overhead dari anggaran tahunan saat ini. • Output tahunan = 50.000 unit • Jam tenaga kerja langsung = 250.000 jam • Anggaran tahunan biaya overhead = Rp. 87.500.000,- dimana sebesar Rp. 37.500.000 merupakan biaya overhead tetap • Selama tahun ini diproduksi 52.000 unit dengan menggunakan 270.000 jam tenaga kerja langsung • Biaya overhead variabel tahun ini sebesar Rp. 52.000.000,- • Biaya overhead tetap tahun ini sebesar Rp.40.000.000,- • Diminta: • Hitung varian overhead tetap pembiayaan dan volume • Hitung varian overhead variabel pembiayaan dan efisiensi

  22. Terima kasih atas perhatiannya Selamat mengikuti ujian semester, semoga berhasil