1 / 8

Green Forum-Water Issues Florida International University August 10, 2007

Green Forum-Water Issues Florida International University August 10, 2007. Miami-Dade Water and Sewer Department (MDWASD) Alternatives to the Biscayne Aquifer. Existing Water System. Population Served 2,250,785 Present Total Flow 348.9 Mgd Source of Raw Water Biscayne Aquifer

elwyn
Download Presentation

Green Forum-Water Issues Florida International University August 10, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Green Forum-Water IssuesFlorida International UniversityAugust 10, 2007 Miami-Dade Water and Sewer Department (MDWASD) Alternatives to the Biscayne Aquifer

  2. Existing Water System • Population Served 2,250,785 • Present Total Flow 348.9 Mgd • Source of Raw Water Biscayne Aquifer • Treatment Plants Hialeah, J. Preston • A. Orr, S. Miami- Dade System

  3. Interim Consumptive Use Authorization and Agreement between SFWMD and Miami-Dade County • Effective May 10, 2006 • Address Issues for Pending Application for a 20-year Consolidated CUP • Alternative Water Supply Plan • Total Cost $1.16 Billion • Interim 18-month Consumptive Use Authorization of 349.76 MGD

  4. Alternative Water Supply Plan • Upper Floridan Reverse Osmosis (RO) Plant – 17.5 MGD Total • Floridan Aquifer Blending – 12.2 MGD Total • South Miami Heights WTP-18 MGD • Reclaimed Water Irrigation – 8 MGD Total (3 MGD CUP Credit)* • Groundwater Recharge – 53 MGD Total (A. Orr, SMH WTP)* • *Included in Reuse Program

  5. FDEP Requirement for Reuse • Wastewater Operation Permit • Implement Reuse if found feasible • Reuse Feasibility Study Update • Completed April 2007 • Recommended Alternative • Over 40.3% Reuse by 2025 • Total of 150.63 MGD • Total Cost- Reuse $1.56 billion • - Reuse and AWS $1.8 billion

  6. Reuse Program • SDWWTP Coastal Wetlands Rehydration Demonstration Project • Aquifer Recharge Demonstration Project • NDWWTP-Reuse Projects* • CDWWTP-Reuse Projects* • SDWWTP-Reuse Project-Aquifer Recharge-Phase 1-30 Mgd (South Miami Heights Water Treatment Plant) * • WDWWTP-Reuse Project-Aquifer Recharge-Phase 2-28 Mgd (Alexander Orr Water Treatment Plant)* • WDWWTP-Reuse Project-Aquifer Recharge-Phase 3-30 Mgd (Alexander Orr Water Treatment Plant)* • SDWWTP-Biscayne Bay Coastal Wetlands Rehydration- • 52 Mgd • *Included in Alternative Water Supply Plan

More Related