PSI Contact

PSI Contact. PSI visit arranged for Feb 9th Assessment of activity/contamination Possible remedial action Seek additional equipment for solenoid Power supply Control system Seek help for installation at a later stage PSI have the experience Augments UK installation effort (for free)

elvis
Download Presentation

PSI Contact

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSI Contact • PSI visit arranged for Feb 9th • Assessment of activity/contamination • Possible remedial action • Seek additional equipment for solenoid • Power supply • Control system • Seek help for installation at a later stage • PSI have the experience • Augments UK installation effort (for free) • Ownership status of equipment • Disposal issues • MoU between CCLRC & PSI ?

  2. ASTeC • Discussions with ASTeC RF group • Will take over in next 6 mo overlap • Equipment form LBNL • Ship to DL • Strip down • Technical assessment • Plan for a test stand at DL

  3. Shutdown work plan • Prior: • Contract to cut hole (KP to sign job order) • ISIS Synchrotron Beam Components • Beam plug (concrete filled steel tube) • During cool down period: • Clear MICE side of wall • Tent and prepare • During: • Clear Synchrotron side of wall • Tent and prepare • Pilot hole • Circular aperture • Clear up • Post: • Install plug • Reinstate shielding

  4. Shutdown Planning