Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: Plans for Task 2 R.Siddans MTR: Estec, 1 October 2013. Overview. Time scale for project to have impact on industrial contracts is very short

elvis
Download Presentation

Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument:Plans for Task 2R.SiddansMTR: Estec, 1 October 2013

  2. Overview • Time scale for project to have impact on industrial contracts is very short • Only minor refinements to current “T1” simulations possible • Include assessment of NO2 AMFs for cloud sensitivity • Explicitly evaluate 30% co-registration error • Consolidation of ESRA (?) • Scope of Task 2 remains to be defined • Remaining requirements from T2 plan are • Non-linear cloud retrievals from more realistic cloud profiles • Intra-band co-registration error for cloud SWIR & H2O retrieval • Realistic model of co-registration wavelength dependence needed • Requirement for HSS data • Effort should be reserved for issues raised by industry • Are there any of these already ?

  3. Approach for cloud/trace-gases • These to be non-linear retrievals based on “realistic” cloud/aerosol conditions as in earlier Eumetsat study • Starting point can be the SWIR scenarios. However optically thick cloud needs to be added (to the existing thin cirrus). • Propose to add optically thick (>1) cloud with varying profile and area-fraction based on a statistical sampling of the CALIPSO 5km layer product within regions on the map (details tbc). • Cloud-fractions vary over range where gas retrievals (in lower troposphere) possible, i.e. <0.5 (tbc). This will lead to two maps (i) as SWIR study with no thick cloud (ii) map with thick cloud of varying cloud. height, fraction and geometric thickness •  SWIR scenarios extended over sea (othewise fixed properties) • but emphasis over land is justified as trace gases primarily required over land even if retrieval over sea possible. •  Errors in trace gases simulated via AMF errors. No need to define trace-gas profiles explicitly.

  4. Consolidation of ESRA • Previously defined requirements on Relative Spectral Radiometric Accuracy (RSRA) have been found difficult to meet. • Effective relative Spectral Radiometric Accuracy has now been adopted: • ESRA is the error at L2 determined using a retrieval gain matrix to propagate a particular L1 error spectrum; this is required to be smaller than 50% of the corresponding L2 user requirement. • Industry expected to apply provided gain matrices to demonstrate compliance • In addition a relaxed RSRA requirement is retained (for NIR 0.25%, relaxed from 0.05%). • This is sufficient for cloud/uv application • Gain matrices have been provided for most species by relevant groups for ESA and industry to use to assess compliance. • For most species only one gain matrix is supplied. • Concerns raised over how representative this approach is, in particular for the NIR band aerosol and cloud retrievals.

  5. Consolidation of ESRA • For the NIR band, RAL have provided a set of gain matrices for aerosol column amounts, for the high-resolution band option (older instrument parameters). • No matrices have been provided for water vapour, cloud or sensitivity of SWIR to NIR. • NB gain matrix approach is unsuitable for cloud retrievals as • (a) the cloud retrieval is highly non-linear and so unlikely to be well represented by a single gain matrix • (b) there are no user requirements on cloud properties (only on the trace-gas retrievals which rely on the cloud retrieval).

  6. Consolidation of ESRA • Within this study, task of deriving requirements for certain errors which dominate the RSRA budget (diffuser structure, spectrally structured stray-light) is replaced by a task to consolidate the ESRA approach. • Tasks involved are: • Provide gain matrices for H2O (IUP) • Provide gain matrices to map NIR band errors to error in SWIR CH4 (Leicester, if not covered by SWIR study) • For each NIR application except cloud/UV, assess representativeness of the gain matrices for selected cases compared to the range of geophysical scenarios (RAL, IUP, Leicester) • Comparing linearly mapped errors for some “generic” errors (e.g. spectrally uniform radiometric offset, spectral shift, 1% spectral response function width), based on gain matrices for the specific geophysical/geometric scenario to the selected conditions. • Optimise gain matrices provided to smallest possible set to capture necessary sensitivities

  7. High Spatial Sampling Data (MR-LEO-SYS-39) • Recently completed S4 Study considered impact of scene inhomogeneity on A-band aerosol retrieval from inhomogeneity in ground scene. • Noveltis simulated impact of inhomogeneity using 3 cloud-free scenes • RAL linearly mapped provided error spectra onto profile retrieval • Error was very large, but mitigation approach based on HSS data leads to effect being negligible • Conclusion not directly transferrable to S5 as number of HSS samples will be significantly fewer (6 for S4) • Performance of mitigation for reduced number of HSS samples could be important to assess, but this can only be done if Noveltis contribution to the study can be arranged. • Noveltis contacted and open to conducting such a task, but funds would need to be found… • Noveltis have already simulated S5 SWIR in context of S4 study so should be well set-up to do necessary work.

  8. Schedule MTR (ESTEC) 1 Oct; PM2 (Bremen) 25 Jan