10 Things in 10 Minutes
This presentation is the property of its rightful owner.
Sponsored Links
1 / 18

John Bare The Arthur M. Blank Family Foundation [email protected] 404.367.2062 PowerPoint PPT Presentation


  • 66 Views
  • Uploaded on
  • Presentation posted in: General

10 Things in 10 Minutes on Philanthropy, Evaluation &Social Change Creative Change 2011 August 18, 2011. John Bare The Arthur M. Blank Family Foundation [email protected] 404.367.2062. 1. The current evaluation culture is crummy. 1. The current evaluation culture is crummy. 2. I have a….

Download Presentation

John Bare The Arthur M. Blank Family Foundation [email protected] 404.367.2062

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


John bare the arthur m blank family foundation jbare ambfo 404 367 2062

10 Things in 10 Minutes on Philanthropy, Evaluation &Social ChangeCreative Change 2011August 18, 2011

John Bare

The Arthur M. Blank Family Foundation

[email protected]

404.367.2062


1 the current evaluation culture is crummy

1. The current evaluation culture is crummy.


1 the current evaluation culture is crummy1

1. The current evaluation culture is crummy.


2 i have a

2. I have a….

METRIC?


2 i have a dream

2. I have a dream.


3 fit the evaluation to the system

3. Fit the evaluation to the system.

Adapted from Getting to Maybe, Westley, Zimmerman, Patton (2006, Random House Canada)


4 segment segment segment

4. Segment. Segment. Segment.

Adapted from HopeLab segmentation report, “To Move Me, First You’ve Got to Understand Me.”


5 pay attention to the arrows not the boxes

5. Pay attention to the arrows, not the boxes.


6 use tools designed for complex systems

6. Use tools designed for complex systems.

  • Leading Indicators

  • Risk Analysis

  • Test Assumptions

  • Triggers for Contingency Plans


7 understand positive negative feedback

7. Understand positive & negative feedback.

  • Compare observed vs. expected.

  • Adjust.

  • Repeat.


8 model social change

8. Model social change.

Change =

Dissatisfaction *

Vision *

Process

or

C = D * V * P

Adapted from Bob Bontempo, Columbia University Business School


9 align evaluation with change stages

9. Align evaluation with change stages.

Are you helping to create Dissatisfaction?


9 align evaluation with change stages1

9. Align evaluation with change stages.


9 align evaluation with change stages2

9. Align evaluation with change stages.

Are you building support for a Vision?


9 align evaluation with change stages3

9. Align evaluation with change stages.


9 align evaluation with change stages4

9. Align evaluation with change stages.

Are you implementing a Process?


9 align evaluation with change stages5

9. Align evaluation with change stages.


John bare the arthur m blank family foundation jbare ambfo 404 367 2062

10.


  • Login