J 2 ramper
This presentation is the property of its rightful owner.
Sponsored Links
1 / 11

J 2 Ramper PowerPoint PPT Presentation


  • 58 Views
  • Uploaded on
  • Presentation posted in: General

J 2 Ramper. Designed and Built By: Curtis Johnson Levi Johnson. Sub Soil Ramping. Issues w/top applied N Residue C/N > 25:1 Volatilization. Size 12 Boot. Application Design. Replicate large scale applicator soil disturbance. Will be used to apply mid-season fertilizer in Jan. & Feb.

Download Presentation

J 2 Ramper

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


J 2 ramper

J2 Ramper

Designed and Built By:

Curtis Johnson

Levi Johnson


Sub soil ramping

Sub Soil Ramping

  • Issues w/top applied N

    • Residue C/N > 25:1

    • Volatilization

Size 12 Boot


Application design

Application Design

  • Replicate large scale applicator soil disturbance.

  • Will be used to apply mid-season fertilizer in Jan. & Feb.

  • Future testing with 10-34-0.


Rate control pumps

Rate Control Pumps

  • 4x

  • 2x

  • 1x


Controls

Controls

  • 3 on-off switches

  • 1 double pole double throw switch

    • Hydraulic pump control

  • Coming soon, 3 pole rotary switch for ease of operation


Mapping ramp location

Mapping Ramp Location

  • Garmin

    • eTrex Vista Cx GPS

  • 1st I Drove around the edge of the field

  • 2nd I traced all the terraces

  • 3rd I Mapped the Ramp locations

    This allows me to log ramp locations from year to year so that ramps are not placed on top of one another, and it is a good way to check for the amount to Nitrogen carry over. (Steps 1&2 only need to be done one initial time.)


Pictures

Pictures


J 2 ramper

3 separately orificed manifolds


Pictures1

Pictures


Pictures2

Pictures


Operation picture

Operation Picture


  • Login