1 / 13

S.M.A.R.T. Project Proposal December 9, 2014 Referendum

S.M.A.R.T. Project Proposal December 9, 2014 Referendum. PROCESS. January, 2014 Initial meeting of large group; many stakeholders To review project needs beyond septic Interest group input Building Condition Survey 2010 Met in March, June Admin group held several meetings to finalize scope.

ellard
Download Presentation

S.M.A.R.T. Project Proposal December 9, 2014 Referendum

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. S.M.A.R.T. Project ProposalDecember 9, 2014 Referendum

  2. PROCESS • January, 2014 • Initial meeting of large group; many stakeholders • To review project needs beyond septic • Interest group input • Building Condition Survey 2010 • Met in March, June • Admin group held several meetings to finalize scope

  3. PROPOSAL • $6,450,000 Project involving all three instructional buildings. • Security • Mechanical • Architectural • Reconstruction • Technology

  4. FUNDING • $1,000,000 Debt “falling off” in 2016-2017. • $350,000 Local share “falling off” • Approximately $140,000 of local share will be replaced with Septic Project costs ($4.1m) • Approximately $210,000 local share remaining will pay for this project. • NO ADDITIONAL OR NEW BUDGET IMPACT • NO ADDITIONAL OR NEW TAXES TO FINANCE

  5. HIGH SCHOOL • Boilers and boiler room piping replacement • Gym Air Handling Units replaced • Elevator Replacement • Pool • UV disinfection system; • Filter and plumbing upgrades • Music Teaching Space (3 practice rooms) • Sports Boosters Concession Stand • Second Floor Teacher Work and Copier space

  6. MIDDLE SCHOOL • Auditorium/Lobby • New ADA bathrooms • Replace doors around Auditorium • ADA-accessible addition to front of building • Reconfigure Main Office entrance for security • Basement drainage • Ventilation (exhaust) in all crawl spaces • Library climate improvements (fans, window treatments) • Replace Electrical switchboard and Panel boards

  7. MIDDLE SCHOOL – cont’d • Walk-in freezer • Tie generator into school to access excess capacity TECHNOLOGY BUILDING • New Boiler, piping, controls, water heater

  8. ELEMENTARY SCHOOL • Translucent/security film on café windows • New locks on café doors • Additional set of doors in entrance hall • Access controls at front doors • Ventilation in crawl spaces • Drainage improvements at upper playground • Time/motion site lighting • Crowd-control fence and entry at Sobus Field

  9. ALL INSTRUCTIONAL BUILDINGS • UPGRADES TO • Phone, • Clocks, • PA, • Fire systems, • Emergency Lighting • Notification appliances

  10. GROUNDS BUILDING • Upgrade fire systems to bring to code • Provide illuminated exit signs and emergency lighting to bring to code TRANSPORTATION • Replace roll-up doors in work bays • Protect exposed ceiling insulation with non-combustible

  11. TIMELINE

  12. NEXT STEPS • BoE resolutions at next meeting: • Vote to Vote (set referendum date) • SEQRA determination (Type II) • Get out the word for December referendum!

  13. SUMMARY • SMART Project proposed at $6.45M • No additional budget/tax impact • December 9, 2014 Referendum • Work planned for Summer 2016 • BoE WILL VOTE TO MOVE FORWARD AT NEXT MEETING

More Related