Our project for a better treatment of waste in Agde

Our project for a better treatment of waste in Agde. S ort out,Treat and Recycl e.

eliot
Download Presentation

Our project for a better treatment of waste in Agde

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Our project for a better treatment of waste in Agde

  2. Sort out,Treat and Recycle In Agde, the number of inhabitants is multiplied by ten between winter and summer. There are 26 000 inhabitants in winter but 200 000 inhabitants in summer. In summer there is also an increase of the amount of waste. In fact, we reckon 41.6 tons of waste per day during winter time but in summer we reckon 320 tons of waste per day!!! We have therefore chosen to ask the following question: How can we improve the treatment of refuse in the town of Agde?

  3. Agde

  4. Solutions We thought about replacing trash-drop-points by automatic-waste-collectors to reduce pollution and traffic  To move wastes we will use a Venturi aspiration system and create a model In the waste treatment industry we will associate the workers’ profitability with a logic of sustainable development

  5. The Summary : I. The Automatic Trash Collectors 1) Presentation of Trash Collectors 2) The electronic diagram II. The Pipe III. The industry

  6. I. The Trash Collector 1

  7. 1)Presentation of Trash Collector Different parts of the Trash Collector household waste Recycable waste Organic waste Glass

  8. Where are the Trash Collectors located ? 140 in Agde 110 in Grau-d'Agde 90 in Cap d'Agde

  9. 2) The electronic diagram

  10. Explication : This is the electronic diagram in which the push button represents the captors of the Trash Collector, there is a sensor for the level of waste and also a sensor for the weight of waste which command the engagement of the motor which opens the trapdoors.

  11. III. The Pipes The pipes allow to move waste to the industry. Every Waste Collecor has a pipe which moves the waste to the industry. To move the waste we want to use the Venturi aspiration system because this system uses green energy and the principal point of the plan is the sustainable development.

  12. III. The Industry This is the electronic diagram of the engagement of the conveyor belt which also triggers an alarm for the employee which marks the beginning of work.

  13. What do you do in the industry ?

  14. What do you do in the industry ?

  15. Conclusion So we have chosen this project because there is an aspect of sustainable development and the pursuit of the project requires several strategies. Thus, a lot of learning is involved.