Welcome to Boulder City Nevada

Loading in 2 Seconds...

play fullscreen
1 / 18

Welcome to Boulder City Nevada - PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on

Welcome to Boulder City Nevada. EDSGN 100 Hydrogen Fuel City Group 5 Stephen Ulisny, Neil Arias, Curtis Covelli , Sebastian Reigber. What we’ll be talking about…. Design Task Background Specs Production Transportation Source of Power Storage Best Solution Flow Chart Prototype

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Welcome to Boulder City Nevada' - elana


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
welcome to boulder city nevada

Welcome toBoulder City Nevada

EDSGN 100

Hydrogen Fuel City

Group 5

Stephen Ulisny, Neil Arias, Curtis Covelli, Sebastian Reigber

what we ll be talking about
What we’ll be talking about…
  • Design Task
  • Background
  • Specs
  • Production
  • Transportation
  • Source of Power
  • Storage
  • Best Solution
  • Flow Chart
  • Prototype
  • Cost Analysis
  • Conclusion
  • Questions
our mission
Our Mission
  • Standardized fueling station for a H2 city
  • Supply the transportation network with H2 fuel using renewable resources
where we ll be stationed
Where we’ll be stationed…
  • Boulder City, Nevada–25 miles SE of Las Vegas
  • Located about 6 miles from the Hoover Dam and 5 miles from the Boulder City Landfill
  • Population: 16,840
  • Requires about

9,000kg of H2 a day

to meet transport

needs

in a perfect world
In a perfect world…
  • Safe
  • Sustainable
  • 350 BAR and 700 BAR for passenger and commercial vehicles.
  • HCNG containing up to 30% hydrogen at 250 BAR
  • 2 stations to meet the city needs with 6 pumps at each station
how will we produce it
How will we produce it?
  • Electrolysis
    • Water
      • Large energy cost
    • Urine
      • Urine breaks down
    • Microbial
      • Not developed
  • Molten Carbonate Fuel Cell
      • Breaks Down
  • Steam Biomethane
      • Costly
how to get it to the station
How to get it to the station
  • Trucks
      • Constant Refill
  • Pipes
      • Costly
  • Produced on Site
      • Need of space
  • Produced at House
      • Not realistic
storage distribution
Storage/Distribution
  • Liquid
      • Expensive
  • Gas
      • Storage
  • Produced Right Before Use
      • Cant keep up with demand
source of power
Source of Power
  • Solar
      • Lack of Space
  • Wind
      • Lack of Space
  • Coal
      • Not Renewable
  • Nuclear
      • Expensive
  • Hydroelectric
      • Not Enough Power
  • Methane Waste
      • Abundance of CH4
our best options
Our best options…
  • Production
    • Steam Methane Reforming
  • Transportation
    • Trucks-H2
    • Piping-CH4
  • Storage
    • Liquid
  • Source of Power
    • Methane
flow chart to station

CO2

Boulder

City

Landfill

Flow Chart to station

CH4

STEAM METHANE

REFORMER

H2

Liquefier

H2

FUEL

STEAM

BOILER

Lake Mead

WATER

LIQUID H2 TRUCKING

PUMPING

STATION

CH4

slide12

LIQUID

H2

STORAGE

CHILLER

VAPORISER

TRUCKED

H2

COOLING BLOCK

H2 GAS

700BAR COMPRESSOR

350 BAR

COMPRESSOR

PUMP

350 BAR H2 STORAGE

BC Landfill

HCNG BLENDER

CNG COMPRESSOR

CH4

CNG STORAGE

the initial cost
The initial Cost…
  • Steam Methane Reformer -> $20,000,000

+

  • Pipelines -> $10,000,000

+

  • Cost of Stations -> $17,324,000
  • Total Cost of System -> $57,324,000
profit per day
Profit Per Day
  • Sell 350 and 700 bar at 4$ a kg ->$30,400 per day
  • Sell HCNG at 5$ a kg -> $37,500 per day
  • Cost to pump -> $40,000 per day
  • 50 employees to run system -> $7,000 per day
  • Nitrogen -> $5,000 per day
  • Methane -> $2,000 per day
  • Total Profit -> $13,900 per day
  • Yearly Profit -> $5,073,500 a year
paving the way for the future
Paving the way for the future
  • The system will be paid off in a little over 11 years
  • This system is replica table around most cities that have landfills in the vicinity
  • We could sell hydrogen for other city needs
resources
Resources
  • Nevada Picture:
    • http://www.flickr.com/photos/travelnevada/3038267667/
    • http://www.ecosalon.com/wp-content/uploads/2010/01/Apex-Nevada.jpg
    • http://www.trucktanks.com/img/fuel/ft010-01.jpg
  • Information
    • http://www.airproducts.com/Products/fastfacts/charts.htm
    • http://www.getenergysmart.org/files/hydrogeneducation/6hydrogenproductionsteammethanereforming.pdf