NICC PLC Update Paul Momtahan , Head Of Marketing

NICC PLC Update Paul Momtahan , Head Of Marketing. SSE Telecom Overview A Scottish & Southern Energy Company. Telecom Business of Scottish and Southern Energy PLC Telecom activities developed in Scottish Hydro-Electric and Southern Electric prior to their merger from internal requirements

elam
Download Presentation

NICC PLC Update Paul Momtahan , Head Of Marketing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NICC PLC UpdatePaul Momtahan, Head Of Marketing

  2. SSE Telecom OverviewA Scottish & Southern Energy Company Telecom Business of Scottish and Southern Energy PLC • Telecom activities developed in Scottish Hydro-Electric and Southern Electric prior to their merger from internal requirements • Scottish Hydro-Electric gained a PTO licence in 1993 and embarked on development of customer projects and sales. • 2,300km fibre network that was laid alongside the Scottish & Southern Energy’s electricity distribution networks in the South of England and North of Scotland, • Scottish & Southern Energy’s portfolio of over sites pylons for mobile operators Acquired Neos In April 2003 • Founded in 1997 • National UK Network With 120 POPs • UK’s First Ethernet Service Provider (Launched Ethernet Service in 10/2001) • Other products: SDH Leased Lines, IP Transit, Dark Fibre, Integration Business

  3. SSE Telecom OverviewScottish & Southern Energy PLC Company Background • Formed in December 1998 from the merger of Scottish Hydro-Electric and Southern Electric • Electricity Supply to 5 Million Customers • Electricity Distribution to 3.3 Million Customers • Top 5 UK Generator of Electricity • 9,474 Employees Unrivalled Financial Strength • FSTE 100 Company • 2003 Revenues: £4,113.6M • 2003 Operating Profit: £685.3M • Market Capitalisation: £5B~£6B • “AA-” Standard & Poor Credit Rating (Best in Telecom!)

  4. Power Line CommunicationsArchitecture Internet & PSTN point to multi-point CPE* Phone(s) point to point PC Low Voltage (“Last mile”) In-Premise (“Last Inch”) High Voltage Medium Voltage Grid (FibreNetwork) * CPE - Customer Premise Equipment PSTN - Public Service Telephone Network

  5. Power Line CommunicationsSpeed & Reach Symmetrical bandwidth with future growth potential (Up to 100Mbps in vendor labs)

  6. Power Line Communications First Mile Transformer Sub-station Home HV Network Controller Modem Meter/ Distrib. To Backbone Network Outdoor Segment Indoor Segment

  7. Power Line Communications First Mile with Repeaters Transformer Sub-station Home • Repeater • Low Voltage Pillar • Street Furniture • Customer Meter Box HV Network Controller Modem Meter/ Distrib. To Backbone Network Outdoor Segment Indoor Segment

  8. Power Line Communications First Mile + In-Premises for MTU MTU Transformer Sub-station HV Network Modem Controller Modem Meter/ Distrib. Adapter To Backbone Network ETH. Outdoor Segment Indoor Segment

  9. Power Line Communications Potential PLC Coverage Area= 3.3M Customers

  10. SSE PLC TrialsCampbletown Re-cap • one of Scotland's most remote mainland towns being the furthest from any other town on the British mainland • until recently, main contact with the rest of Scotland was by sea • Ireland is just 20 km away

  11. SSE PLC TrialsCampbletown Re-cap Schematic Network

  12. SSE PLC TrialsIncreasing Scale of Activities

  13. SSE PLC TrialsWinchester Marketing Trial

  14. SSE PLC TrialsStonehaven Marketing Trial

  15. PLC EconomicsSatellite Backhaul • Lower capital cost but higher running costs • Scale Requirements: 30~50 customers • Within reach of one substation (400 m radius) • Within reach of multiple substations • SDSL links on same exchange • Medium Voltage PLC links • Broadband wireless links • Income/customer = ~£30/month • Public sector requirements can reduce this

  16. PLC EconomicsFibre or Microwave Backhaul • Lower running costs • Scale Requirements: 100~200 customers • Within reach of one substation (400 m radius) • Within reach of multiple substations • SDSL links on same exchange • Medium Voltage PLC links • Broadband wireless links • Income/customer = ~£30/month • Public sector requirements can reduce this • Public sector backhaul can reduce this further

  17. PLC Regulation • PLC has the potential to interfere (Like any radio source) • Probability of interference is very low (based on real life experience) • Equipment can shift/block selected frequencies to avoid problems • Need to show protection of “small users” • Impossible to legislate for complete radio protection and free spectrum use

  18. PLC Regulation • No regulatory problems (worldwide still no significant complaints arising from PLC despite 100’s of thousands of passed properties) • 80% of the measured values are below 55dBµV/m (for both indoor and outdoor measurement points) • 94% of the measured outdoor values are below the JWG CENELEC/ETSI currently proposed limit (55 dBµV/m) • 60% of the outdoor measurements are lower than the surrounding noise floor

  19. Summary • Broadband by PLC works • Technically • Profitable commercial models exist • The real test is whether utilities can market broadband services to their customers • On their own • In partnership with others • In direct competition with cable & DSL