1 / 11

Country: Latvia

RER/9/096 Regional Planning Meeting “ Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II). Country: Latvia. 19-20 March 2009 IAEA, Vienna. Content. Main activities since 2008 SWOT analysis: evaluation of the user’s infrastructure

Download Presentation

Country: Latvia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RER/9/096 Regional Planning Meeting“Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Latvia 19-20 March 2009 IAEA, Vienna

  2. Content • Main activities since 2008 • SWOT analysis: • evaluation of the user’s infrastructure • evaluation of the national infrastructure for the control of radiation sources • Facts & figures • Changes: • successes • unresolved problems

  3. Evaluation of user’s infrastructure

  4. Evaluation of regulatory infrastructure

  5. LegislationRegulations and Guidanceoccupational protection, public protection, medical exposure, radioactive waste, and the transport of radioactive materials. • Updates of the framework Law: • October 2008, changes for implementation of the HASS directive: • mainly new definitions related to SNF management • Implement changes related to the framework for the State duties • Minor modifications of the regulations related to the emergency preparedness: • To reflect institutional changes • New regulations for emergency preparedness training activities • The comprehensive reports were made available for RASSIA missions

  6. Facts & Figures • More than 900 licensed operators • 450 inspections per year • More than 3000 radiation workers receiving TLD services • Legal framework: • The framework Law (1994/2000) • 24 main regulations • Main “developments” • “optimisation of the structure: • less for support and general functions • what can be not done (or at least postponed)? • to meet “targets” - from 34 to 31, 29, 26

  7. The Regulatory Body • A single regulatory body since mid 2001 • 3 main divisions and 1-2 support divisions • To implement Management System: • PHARE projects in 2004-2007 (more than 50 guides) • Further developments (up to end of 2008): • From quality management to management system • More technical and procedural guides (more than 150) • Effective independence – target reached in 2001: • First RASSIA conclusions – issue is under the question • Opinion from Latvia – misinterpretation of the legal system • RASSIA follow-up: • RDC is an effectively independent • Further “developments” could weaken capabilities to ensure implementation of effective independence

  8. The Regulatory Body (cont.) • Funding: • Up to 2008 available resources partly met the needs (except to maintain the staff) • Since late 2008 the trends are not satisfactory ~ RDC tries to maintain its capabilities, but further cuts can prevent fulfilment of the obligations • Recommendations by RASSIA follow-up: • RDC, regulatory body is responsible for radiation safety, must remain an effectively independent regulator: • stand-alone or • as a significant part of a larger effectively independent institution • The licensing, inspection and early warning should remain at least at their present sizes • Any transition of the current arrangements for radio-analysis and personal dosimetry services must be managed responsibly so that essential services and standards are maintained

  9. Regulatory Body Staffing and Training • Number of staff – 25/26 (March 2009): • future not yet clear • Changes, but also more applicants for considerations • Education: • availability of skills: • “old” staff members had the chance for trainings • skills are regularly assessed • newcomers – need to be treated separately • access to training and development: • less projects, less cooperation activities directed to the trainings • more enhancement activities e.g. exchange of information/knowledge in conferences and expert group activities • changes of the attitude ~ “you are already developed” • training needs: • but we still have newcomers, thus somebody should attend trainings • more sub-regional activities

  10. Notification - Authorization – Licensing - Inspections • There are no major changes since 2000 • Licensing: • RDC performs assessment of the applications • Licensing Commission provides opinion • RDC issues licenses • Validity period – is under considerations, might be increased, but then inspections and regular reporting shall be enhanced • Risk based procedures – the frequency for inspections adjusted to the risks • There could be changes in approach for planned inspections: • optimisation of complex (comprehensive) inspections • to choose ratio of complex and task oriented inspections

  11. Plans • Main plans – how to maintain the system, when still constant changes and political decisions prevail • Main needs for 2009-2011: • access of the training • to maintain the networking • integration of different data management systems (web based RAIS is very welcome) • Some changes in legislation will be needed, but after clarifications on plans to revise arrangements for all public organisations

More Related