IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING. URS Corporation January 22, 2003. Risk Analysis. Based on the following equation: Risk = (P load )(P response )(consequences) Quantifies the risks of an embankment/ levee How could failure occur? How likely is it?

elaina
Download Presentation

IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IN-DELTA STORAGE PROGRAMSTAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003

  2. Risk Analysis • Based on the following equation: Risk = (Pload)(Presponse)(consequences) • Quantifies the risks of an embankment/ levee • How could failure occur? • How likely is it? • What would happen if it did?

  3. Failure Modes • Static Loads • Seepage/piping, slope stability, foundation stability, operational problems • Floods • Overtopping, increased chance of static failure • Earthquakes • Foundation liquefaction, deformation, cracking, increased chance of static failure

  4. Estimate Consequences • Potential loss of life • Based primarily on affected downstream population, available warning time, and estimated severity of the flood wave • Economic • Includes downstream damages from failure, loss of infrastructure, lost project benefits, embankment replacement costs, etc.

  5. Probabilities of Breach Scenarios • Loading event • Flooding • Seismic • Operational • Load level • Return period

  6. Probabilities of Breach Scenarios (cont’d) • Operational scenario • Reservoir level • Tide level • Breach scenario • Inward • Outward • Probability of breach scenario • Product of above events and scenarios

  7. Consequences & Probabilities of Breaching • Consequences of Breach (cost) • Inward Breach • Outward Breach • Probability of flooding of neighboring islands due to outward breach • Consequences of flooding of neighboring islands • Risk analysis will be used to recommend reservoir embankment design