An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OpenADE:Roadmap, ITCA, Sample Implementation November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair

  2. Agenda for Face-to-Face Meetings • OpenADE Introduction, Review (optional) • NAESB Energy Services Provider Interface (ESPI) Introduction • OpenADE 2.0: Scope, Business and User Requirements • OpenADE Roadmap (four months / twelve months) • OpenADE / ESPI Interoperability and Conformance Testing Authority (ITCA) • Sample implementation of ESPI

  3. Agenda for this (Wednesday PM1) Meeting • Recap of OpenADE 2.0 Scope discussion, from yesterday PM2 Session • OpenADE Roadmap (four months / twelve months) • Sample implementation of ESPI • OpenADE / ESPI Interoperability and Conformance Testing Authority (ITCA)

  4. OpenADE 2.0 Scope, Requirements • Pricing / schedule (TOU tier, block thresholds) • DR events • Messages (for human consumption) • Outage events (planned, unplanned) • Goals (targets), projections • Power quality, other events (incl. Errors) • Other grid conditions, needs, control • Role reversal, fair is fair (roles can change) • Capabilities and state of distributed resources

  5. OpenADE Roadmap Potential Roadmap Elements Include: • OpenADE 2.0 Requirements • Use Cases • Business Requirements • System Requirements • Initial Service Definition • Testing and Conformance • Versus OpenADE? Versus ESPI? • Sample Implementation of ESPI Standard • Others? • Alignment with other groups, harmonization, etc.

  6. OpenADE 2011 Roadmap (Proposed) • Q1 2011 • Clarification of Interoperability Testing and Conformance Authority -- Formation of Industry Alliance? • Contribute to ESPI Sample Implementation Effort • Q2 2011 • NAESB: Finalize ESPI specifications, ballot, resolution • Begin OpenADE 2.0 Requirements • Q3 2011 • OpenADE “acceptance” of NAESB ESPI 1.0 • Certification of first candidate implementation • Q4 2011 • Complete OpenADE 2.0 Requirements • Q1 2012 • NAESB: ESPI 2.0?

  7. ESPI Sample Implementation • Key contribution for development, adoption of ESPI standard • Not appropriate for work to be done within NAESB • Effort forming to focus on this, other contributions to Smart Grid collaboration: EnergyOS, championed by John Teeter, PeoplePower • OpenADE members to contribute to ESPI sample implementation via EnergyOS participation?

  8. Testing and Certification