NRC’s Modeling Needs and Capabilities for Effective Emergency Response

NRC’s Modeling Needs and Capabilities for Effective Emergency Response. Stephen A. McGuire Incident Response Operations US Nuclear Regulatory Commission (301) 415-6204 sam2@nrc.gov. Chronology of Response Early Phase - Nuclear Power Plants.

early
Download Presentation

NRC’s Modeling Needs and Capabilities for Effective Emergency Response

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NRC’s Modeling Needs and Capabilities for Effective Emergency Response Stephen A. McGuire Incident Response Operations US Nuclear Regulatory Commission (301) 415-6204 sam2@nrc.gov

  2. Chronology of ResponseEarly Phase - Nuclear Power Plants • Significant malfunction detected by plant instruments • Licensee declares emergency based on pre-established criteria • Licensee notifies State first, NRC second

  3. Chronology of ResponseEarly Phase - Nuclear Power Plants • NRC makes decision on whether to staff it’s Emergency Operations Center • Staffing could be as small as 3-4 people or up to 80 • Staffing should be largely complete in less than an hour

  4. Chronology of ResponseEarly Phase - Nuclear Power Plants • Communications links established and information collected • Dose models will be run to determine appropriate protective actions for the public (e.g. evacuation, sheltering) • The State makes the decision on whether to order protective actions • NRC has advisory role

  5. Chronology of ResponseIntermediate Phase - Nuclear Power Plants • This phase starts after the plume has passed • Need to know whether relocation is necessary due to deposited radionuclides, whether interdiction of crops is necessary, and where there are decontamination needs

  6. Chronology of Response Intermediate Phase - Nuclear Power Plants • Models should indicate the path of the plume and deposition patterns • However, the need for protective actions will be determined primarily by field measurements • FRMAC has the primary responsibility for making and analyzing field measurements

  7. Chronology of ResponseFuel Cycle / Radioactive Materials / Transportation • Released quantities of radionuclides much smaller • Often release would have taken place before NRC Emergency Operations Center staffed

  8. Chronology of ResponseFuel Cycle / Radioactive Materials / Transportation • Licensee expected to notify local officials and recommend protective actions based on the nature of the accident • Each accident type has a predetermined protective action that was based on modeling of the release

  9. Necessary Model Features for NRC Emergency Response • Built-in source term module • Built-in dose projection capability • Rapid runtime (minutes) • Easy to use by occasional users • Appropriate range (usually 10 miles) • Must model dry and wet deposition • Must model radiological decay and buildup in transit

  10. Current NRC Dose Model • NRC has developed the RASCAL code to generate radiological source terms, estimate atmospheric transport and diffusion, and calculate doses to potentially exposed people • NRC had already identified the needed criteria for it’s modeling needs and developed the RASCAL code to meet the needs

  11. RASCAL Descriptors

  12. RASCAL Descriptors

  13. RASCAL Descriptors