CKOV Progress 5-4-07

Loading in 2 Seconds...

play fullscreen
1 / 7

CKOV Progress 5-4-07 - PowerPoint PPT Presentation


  • 85 Views
  • Uploaded on

CKOV Progress 5-4-07. PMT Shields completed. Awaiting paint job - @Mississippi. PMT Enclosures parts @IIT begun (delrin material ordered). PMT selection at Trieste begun (April). LED Pulser Electronics and PMT HV Supply in hand. PMT Base v-1 @ FNAL complete.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' CKOV Progress 5-4-07' - earl


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

CKOV Progress 5-4-07

  • PMT Shields completed. Awaiting paint job - @Mississippi.
  • PMT Enclosures parts @IIT begun (delrin material ordered).
  • PMT selection at Trieste begun (April).
  • LED Pulser Electronics and PMT HV Supply in hand.
  • PMT Base v-1 @ FNAL complete.
  • CKOV Box Machining to begin @Iowa in May.
  • CKOV Steele Ordered IIT+Iowa (3wk delivery).
  • Nickel Plating company in hand. (2 wk turn around
  • Aerogel Order Placed by Dan. (April)
  • Aerogel Box dimensions checked- machining in May.
  • Schott Glass Window Vendor in hand.
  • Lexan Slumping Oven completed.
  • Oven Temperature Controller Completed.
  • Mirror slumping prototype tests completed.
  • Slumping of MICE prototypes to begin.
  • Fermilab Mirror coating schedule needs work. Eileen Hahn.
  • CKOV detectors ~600lb (270Kilo) ea
  • Fedex OxfordMississippi-OxfordUK ~$1000/500lb

CKOV Progress Report, L. Cremaldi, 5-4-07

slide2

Back cover

Steele frame(down)

Steele sides

Steele frame(up)

front cover

front mirrors

side mirrors

aerogel

Schott glass window

CKOV Exploded View

window frame

CKOV Progress Report, L. Cremaldi, 5-4-07

slide3

CKOV to Solid Works Translation- Checking

  • M. Reep has converted all drawings to Solid Works and has performed
  • dimensional checks.

CKOV Progress Report, L. Cremaldi, 5-4-07

slide4

Aerogel Compartment

  • Delrin in hand
  • Matsushita will slice 6 corner panels  at 45deg.
  • Machining to begin soon.

CKOV Progress Report, L. Cremaldi, 5-4-07

slide5

Base Layout V1 - Sten Hansen - FNAL

Sten has made first layout and we will begin prototype. Sockets

on order.

CKOV Progress Report, L. Cremaldi, 5-4-07

slide6

CKOV Progress Report, L. Cremaldi, 5-4-07

FiberGlass Oven Enclosure

  • Simple Fiberglass enclosure with heating elements- D. Summers design.
  • Lexan Slumping temperature ~ 150C
  • Temperature controller regulates to +-2 degC.
  • Preliminary testing finished and bending of MICE prototypes to begin.
  • Mirroring at FNAL ASAP.

CKOV Progress Report, L. Cremaldi, 5-4-07

slide7

Commissioning Plan

  • Plan-A
  • - Mechanical parts to Mississippi ( June).
  • Practice Assembly + Light Leak Checking.
  • Begin shipping to RAL >July 4)
  • Cremaldi+Sanders to RAL July 15 - Aug 1.
  • Aerogel Assembly week-1
  • Mechanical Assembly and Install week-2
  • Plan-B
  • - Mechanical parts to FNAL ( June).
  • Practice Assembly + Light Leak Checking.
  • Begin shipping to RAL >July 4)
  • Cremaldi+Sanders to RAL July 15 - Aug 1.
  • Aerogel Assembly week-1
  • Mechanical Assembly and Install week-2

CKOV Progress Report, L. Cremaldi, 5-4-07