项目七 轨道施工. ------- 广州地铁二号线轨道施工技术. 城市轨道交通学院. 项目施工工序. 项目能力目标. 项目及施工方法简介. 项目任务分解. 项目施工工序. 道床施工. 轨道铺设. 道岔铺设. 能力目标. 具备道床施工及轨道铺设能力;具有与人沟通,团队协作能力。. 一、项目简介.

Download Presentation

项目七 轨道施工

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


4461445

项目七 轨道施工

-------广州地铁二号线轨道施工技术

城市轨道交通学院


4461445

项目施工工序

项目能力目标

项目及施工方法简介

项目任务分解


4461445

项目施工工序

道床施工

轨道铺设

道岔铺设


4461445

能力目标

具备道床施工及轨道铺设能力;具有与人沟通,团队协作能力。


4461445

一、项目简介

广州地铁二号线以琶洲站为起点,终点为江夏,呈南北走向。全长18.25Km,全部为地下线,共设16个车站,一座车辆段及综合基地,2座主变电站,4个集中冷站,全线的控制中心设在一号线的控制中心。线路采用标准轨距1435mm,正线采用双线,右侧运行方式;正线最小曲线半径为400m,困难地段为350m,正线为60kg/m钢轨无缝线路。大面积采用无砟轨道技术;采用500米长钢轨工地焊接施工工艺,跨区间进行长大无缝线路铺设。


4461445

二、施工方法简介

该工程采用了无碴轨道施工技术,板式无碴轨道道床,一次铺设长钢轨,根据板式无碴轨道的技术特点,经过引进消化吸收再创新的国际领先技术,具有线路寿命长、维护周期长、粉尘污染少、噪音低的特点。这些标志着中国在轨道建设技术上取得重大突破,对大规模轻轨地铁建设具有重要示范意义。


4461445

任务分解

任务一

任务二

任务三

无碴轨道

道床施工

(4课时)

轨道铺设

(4课时)

整体道床

道岔铺设

(4课时)