An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Red Lake Watershed District10 Year Overall Comprehensive Plan Red Lake Watershed District & HDR Engineering, Inc. Thief River Falls, Minnesota Presentor: Corey Hanson, Water Quality Coordinator Red Lake Watershed District

  2. Overview of the Red Lake Watershed District- Location -

  3. Major Subwatersheds of the RLWD

  4. 5,990 Square Miles

  5. Land Use – 41% Agriculture

  6. RLWD Projects

  7. Engineering Projects • Impoundments and Dams • Ring Dikes • Ditch Inspection • Ditch Cleaning • Permit Inspection • Stream Gauging • Snow Sampling • Clearing and Snagging

  8. RLWD Projects- Water Quality - • Long-Term Water Quality Monitoring • Over 30 sites • At least 4 samples per year • Lake and Stream Monitoring • Special Studies • Clearwater Lake Water Quality Model, Habitat/Bioassessment, Tile Drainage Study • Water Quality Improvement Projects • Erosion Control • BMP Implementation

  9. 10-Year Plan – RLWD Concerns • Agricultural and Urban Flooding • Water Quality • Natural Resources • Water Supply • Economy • Recreation

  10. Elements of the Plan • General Description of the District • Description of Water Resources • Economic Development • Historic Flood Problems • FDR/NRE Overall Watershed Goals and Objectives • Water quantity, quality, erosion, natural resources • Implementation Plans for each subwatershed • Annual Monitoring and Evaluation Program • Projects

  11. Plan Process • Public Involvement • Hydrologic Model • Inventory and Assessment • Development of Long-Term Goals • Describe Ways of Measuring Success • Develop a Financial Toolbox

  12. Public Involvement • Identify issues • Ag & urban flooding • Water quality • Natural Resources • Water Supply • Economy • Recreation • Consensus

  13. Overall Advisory Group • Citizen Advisory Committee • Technical Advisory Committee • Broad array of stakeholders • Give them power to make decisions • Give credibility to the plan and justify implementation plan

  14. Overall Advisory Group • Community-based assessment of problems (restoration) and opportunities (prevention) • Citizen involvement can increase chance of success • Constituency of advocates • Demonstrate solutions that can be applied to other communities • Citizens and stakeholders foot the bill, so they should have input • Use RLWD website (www.redlakewatershed.org) to share information

  15. Defining and Ranking Issues in Subwatersheds - Example

  16. Hydrologic Model • 14 Subwatersheds modeled using GIS and HEC-1 interface (ArcView and HEC-GeoHMS)

  17. Standard Geo-HMS Processes 1. Determine Sub-watershed Boundaries and Drainage Flow Directions – Raw Data came from MN-DNR 2. Terrain is then Pre-Processed to Arcview Format using Arc-GIS software.

  18. Standard Geo-HMS Processes 3. A Digital Elevation Model of the study area is Created within Arcview 4. Flow Accumulation and Flow Direction Grids are generated next.

  19. Standard Geo-HMS Processes 5. Based on the DEM, Flow Acc, and Flow Direction Grids, Arcview can determine the Minor Watershed Boundaries, and the streams and channels within those watersheds. 6. Stream and Sub-basin characteristics such as length, slope, mannings value, and basin centroid, are then determined within Arcview.

  20. Standard Geo-HMS Processes 7. A sub-basin curve number, and a design Rainfall is then Applied to the watersheds. Also Tc or Time of Concentration is then calculated for each watershed. This data is then imported back into ArcView from Microsoft Excel. 8. Geo-HMS then generates a schematic, legend, and background map file for the entire study area watershed. This model is then exported from Geo-HMS to HEC-HMS. You now have a working Model.

  21. Lost River Red Lake River Clearwater River Examples of Models Lower Badger Beau Gerlot Maple Lake Heartsville Coulee Burnham Creek • Examples of Models Grand Marais Hill River Poplar River

  22. StormLab

  23. Example Calibration

  24. We can now use the model to help determine the benefits of new projects. Benefits • Ditch improvements, easements, diversions, retention, crop residue management, floodplain management, and changes in land use

  25. Pre- and Post-Project Flood Areas Pre-Project Flooded Area Post-Project Flooded Area

  26. Inventory and Assessment • Inventory and Assessment of Water and Land Resources Related to Priority Concerns in the Watershed • GIS data layers • Information from other agencies • Natural Resources Assessment

  27. Natural Resources Assessment • Use GIS to develop base resource maps • Consult NR professionals to refine maps and develop goals, objectives, strategies,and priorities for each subwatershed • Present products to committees

  28. Natural Resources Assessment • Existing Resource Analysis • Large habitat blocks, quality habitats, sensitive species, public/conservation lands, wildlife concentration lands • Restorable Resources • Farmed wetlands, partially drained wetlands, unstable waterways, water quality improvement areas, potential sediment yield • Priority Natural Resource Areas • CRP and RIM lands, large private parcels, watershed management initiatives, infrastructure, most productive agricultural land

  29. Natural Resources Assessment

  30. Natural Resources Assessment

  31. Development of Long-Term Goals • 10-yr implementation strategy • Address priority concerns • Tangible outcomes are keys to success of plan • Workshops with committees for water quantity, water quality, erosion, and natural resources

  32. Setting Flood Prevention/Protection Goals • Vision Statement • We envision a reduction in flood damages with active cooperation and education of constituents and public partners • Goals • Reduce peak flows by 10% • Reduce runoff volume contributing to peak flows by 30,000 ac-ft • Identify special projects to implement • Education • Floodplain management programs

  33. Early, Middle, Late Concept • Early • Moves ahead of major flood flows • Increase speed of removal to reduce peak flows • Middle • Typically coincides with flood peak • Slow down to reduce flood peaks downstream • Late • After the major flood flows • Slow down to reduce downstream peak flood flows

  34. Early, Middle, Late Concept

  35. Describe Ways of Measuring the Project’s Success • Specify levels of flood protection • I.E. Ag protection for a 10-yr 24 hr storm • Water quality improvements • Habitat Improvements • Acres of buffer strips, acre-feet of water, acres of habitat

  36. Develop A Financial Toolbox • Projects benefit multiple groups – multiple sources of funds • Identification of funding partners • Review levy funding mechanisms

  37. THE END Points to Consider • Water can be controversial • Planning process should be consistent over subwatersheds, even though subwatersheds have different goals • Try to return natural functions to the landscape where practical • Think long-term with low-maintenance solutions • Develop broad based understanding of the complicated nature of water management • Recognize past solutions that worked and did not work for meeting goals • Utilize existing studies and reports when setting goals • Create a set of goals for each subwatershed www.redlakewatershed.org