Geyser - Class-1, MFV placing at the time of packing

Geyser - Class-1, MFV placing at the time of packing. This is the Multi function valve Put Separate in the Thermocol as shown in picture. MFV in Plastic body at the time of Packing. This is The MFV. MFV in Metal body at the time of Packing.

duman
Download Presentation

Geyser - Class-1, MFV placing at the time of packing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geyser - Class-1, MFV placing at the time of packing This is the Multi function valve Put Separate in the Thermocol as shown in picture. MFV in Plastic body at the time of Packing This is The MFV MFV in Metal body at the time of Packing At the time of product installation assemble the Multi Function Valve in Inlet Pipe without any Changes in Multi Function Valve.

  2. Geyser - Class-1, Draining Procedure Procedure to Drain the water from tank to prevent the Scaling in Element & Tank. Before Draining the water remove the Screw from MFV by screw Driver then open the Lever as shown in Picture 2. After finish the Draining it is must again tighten the screw in MFV properly as shown in Pic. 1. After Before Screw Lever Pic. 1 Pic. 2