An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chisholm Trail Parkway

  2. Chisholm Trail Parkway: Section 1 Crews demolishing concrete south of Vickery Blvd.

  3. Chisholm Trail Parkway: Section 1 Breaking existing pavement on Vickery Blvd. for removal

  4. Chisholm Trail Parkway: Section 1 Crews drilling shaft for bridge foundation west of Center St.

  5. Chisholm Trail Parkway: Section 1 Crews installing 42-inch pipe storm water line

  6. Chisholm Trail Parkway: Section 1 Installing 54-inch storm water drainage pipe

  7. Chisholm Trail Parkway: Section 1 Pouring concrete for drilled shaft foundation north of Center St. and Vickery Blvd.

  8. Chisholm Trail Parkway: Section 1 Assembling reinforcing steel for bridge foundation on Vickery Blvd.