NASA Technical Standards JSC Summary Quad Charts June 2007 (Sponsored by NASA Chief Engineer)

NASA Technical Standards JSC Summary Quad Charts June 2007 (Sponsored by NASA Chief Engineer). STATUS REPORT FOR STANDARD IN DEVELOPMENT NASA-STD-5019: Fracture Control Requirements for Spaceflight Hardware Date: June 2007. TWG Chair: Scott Forth scott.c.forth@nasa.gov Center: JSC

Download Presentation

NASA Technical Standards JSC Summary Quad Charts June 2007 (Sponsored by NASA Chief Engineer)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NASA Technical Standards JSC Summary Quad ChartsJune 2007(Sponsored by NASA Chief Engineer)

  2. STATUS REPORT FOR STANDARD IN DEVELOPMENT NASA-STD-5019: Fracture Control Requirements for Spaceflight Hardware Date: June 2007 TWG Chair: Scott Forth scott.c.forth@nasa.gov Center: JSC Phone: 281-483-2480 Proposal No.: Assigned by Proposal System If VCS, Standards Developing Org: Start: January 2007 Deliver to NTSPO: June 2007 Task Description: Transition from interim standard. Plans ● Undergoing EMB Concurrence ( Final Draft dated 05/07/07). Accomplishments ● Altered the Pressure Vessel requirements based on lessons learned from SSP and ISS and coordinated with the NESC. ● Made minor clarity changes based on feedback from Lockheed Martin’s use of NASA-STD-(I)-5019 from Orion. ● Resolved 146 changes with Agency-wide review. OBS = Obligated; COST = Costed

  3. STATUS REPORT FOR STANDARD IN DEVELOPMENT NASA-STD-6016: Standard Materials and Processes Requirements for Spacecraft Date: June 2007 TWG Chair: Michael Pedley Center: JSC Phone: 281-483-8913 Proposal No.: Assigned by Proposal System If VCS, Standards Developing Org: Start: January 2006 Deliver to NTSPO: March 2007 Task Description: Create Agency standard for spacecraft materials and processes requirements Plans ● Review comment dispositions with originators by the end of August. Accomplishments ● Agency-wide review complete (no responses from ARC, DFRC, GRC and “no comments” response from GSFC). ● About 150 comments in comments resolution matrix; all have received preliminary disposition but disposition not yet coordinated with originators. OBS = Obligated; COST = Costed

  4. STATUS REPORT FOR STANDARD IN DEVELOPMENT NASA-STD-6008: Fastener Management and Control Practices Date: June 2007 TWG Chair: Rajib Dasgupta Center: JSC Phone: 281-483-4739 Proposal No.: Assigned by Proposal System If VCS, Standards Developing Org: Start: August 2006 Deliver to NTSPO: TBD Task Description: Technical Working group to lead development of the NASA fastener control standard. FTE includes 0.10 FTE for TWG chair and 0.05 FTE for JSC fastener consultant. Plans ● A face-to-face meeting to discuss more serious issues is being planned at JSC for late June or early July. Accomplishments ●Work in the past 6 months has been in resolving issues identified by review at other NASA Centers. ● Fifty one out of the 132 comments have been addressed in the draft document. ● Drafted flow-chart depicting how fasteners are classified; will be finalized shortly. OBS = Obligated; COST = Costed

  5. STATUS REPORT FOR STANDARD IN DEVELOPMENT NASA-STD-Proposal: Systems Approach to Space Environments Effects Date: June 2007 TWG Chair: Henry Garrett/ Insoo Jun Center: JPL Phone: 818-354-2644 Proposal No.: JPL-2007-35 If VCS, Standards Developing Org: Start: Estimated May 2007 Deliver to NTSPO: September 2009 Task Description: Create Agency standard for Spacecraft Environments Interactions JSC Point of Contact: Steven Koontz @ 281-483-8860 Plans ●JPL Lead Center. JSC effort to be conducted by civil servants; no procurement $ required. Accomplishments ●New Proposal OBS = Obligated; COST = Costed

  6. STATUS REPORT FOR STANDARD IN DEVELOPMENT Nano Technology ANSI TAG Date: June 2007 TWG Chair: Leonard Yowell Center: JSC Phone: 281-483-2811 Proposal No.: N/A Start: Deliver to NTSPO: Task Description: Represent the Agency to the ANSI TAG on Nano Technology. Plans • Accomplishments • ●Supported Technical Advisory Group meeting in Japan toward end of 2006. OBS = Obligated; COST = Costed