Energy Efficiency as part of the integrated approach. Gisela Holzgraefe. Content of this presentation. background objectives of the IMPEL project 2011 / 2012 methodology and work done results recommendations. 13-9-2014. 2. Background – EU policy.

Download Presentation

Energy Efficiency as part of the integrated approach

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Energy efficiency as part of the integrated approach

Energy Efficiency as part of the integrated approach

  • Gisela Holzgraefe


Content of this presentation

Content of this presentation

background

objectives of the IMPEL project 2011 / 2012

methodology and work done

results

recommendations

13-9-2014

2


Background eu policy

Background – EU policy

EU policy regarding energy efficiency:reduce greenhouse gas (GHG) emissions by 20% of 1990 level by 2020

Member States agreed to reach the objective by

- Reducing energy consumption by 20 %

- Increasing use of renewable energy sources by 20%;

- Increasing the share of biofuel in transport sector by 20%.

13-9-2014

3


Background eu legislation

Background – EU legislation

EU legislation related to industrial installations addresses energy efficiency

IPPC Directive (96/61/EC)

Directive 2010/75/EU on industrial emissions:- Member States shall take measures that energy is used efficiently (Art. 11 f) permit applications include a description used in or generated by the installation (Art. 12 b)

BAT conclusions shall be the reference for setting the permit conditions (Art 14 (3)). EE = one criterion for determining BAT

13-9-2014

4


Background impel activities

Background – IMPEL activities

  • IMPEL project „Energy Efficiency in Environmental Permits“ 2002/2003

  • Development of horizontal BREF document „Energy Efficiency“

  • IMPEL project „Energy Efficiency in Permitting and Inspection“ 2010 main item: evaluation of the current situation; result: no improvements so far


Background impel activities1

Background – IMPEL activities

  • Proposal of a follow-up project : Development of a template for documents and data required regarding energy efficiency in the permit application

  • Steps:

    - development of the template in 2011 and- practical test 2012


Objectives of the impel project 2011 2012

objectives of the IMPEL project 2011 / 2012

objectives:

Identify how requirements of the EE BREF and EE related chapters of BREFs need to be integrated in permit activities

Explore what kind of information is needed in permit applications

Develop a template for documents and data required regarding energy efficiency in the permit application

Carry out practical tests with the template in permit procedures

13-9-2014

7


Methodology and work done in 2011 1

Methodology and work done in 2011 (1)

  • Work with an expert team (project team plus experts)

  • Discussion of EE items in the IPPC-Directive / IED

  • Presentations on EE items in LCP sector, iron and steel sector, manufacture of glass, cement industry and dairy sector and discussions with experts

  • Development of a draft general application form

  • Conclusion: general form applicable, but sector specific supplements necessary


Methodology and work done in 2011 2

Methodology and work done in 2011 (2)

Development of draft supplements for: - the iron and steel sector*- the manufacture of glass*- cement, lime and magnesium oxide production*- food, drink and milk sector- intensive rearing of poultry and pigs

Basis:- BREF documents- BAT conclusions*- input of experts

13-9-2014

9


Methodology and work done in 2012 1

Methodology and work done in 2012 (1)

  • Work with a working group (project team and permit writers)

  • Improvement of draft application form and sector specific supplements

  • Test of the draft application form and the annexes in permit procedurestwo alternatives  starting permit procedures or finalised permit procedures

  • translation of general application form, sector specific annex for glass industry and intensive rearing of poultry and pigs into German


Methodology and work done in 2012 2

Methodology and work done in 2012 (2)

draft application form and sector specific supplements were tested in the following sectors:

steel sector by ARPA Lombardia (IT)

glass industry (DE)

intensive rearing of pigs (DE)

two small food processing companies (DE)

sloughter house (DK)

large combustion plant based on biomass (DK)

13-9-2014

11


Results 1

Results (1)

evaluation of the work with the documents and the experience with them by using a questionnaire

Main results:clear definition of system boundaries – key challengeuse of benchmarks – good approach

collection of EE data from previous years would allow for comparisons and identification of improvements

13-9-2014

12


Results 2

Results (2)

participating operators partly declared their data as confidential

existing installations: sometimes difficult for the operators to provide the necessary data(does not apply for companies with ISO 50 001 system)

new installations: operators have the data and are able to fill in the application forms

participants in the test said that sector specific supplemetns were useful

13-9-2014

13


Results 3

Results (3)

motivation of operators was higher when they were directly contacted by representatives from the authority and advice was offered

representatives of an agricultural organisation said that the information required is available for new installations and made proposals for the improvement of the annex

motivation of operators does not necessarily correspond with the size of the installation – two small food processing companies were highly motivated

13-9-2014

14


Results consequences for authorities

Results – consequences for authorities

authorities: need for specialisation / training of staff members for dealing with EE

the general application form and the supplements were considered as valuable – provide basic knowledge

application should be well prepared and carried out in 3 steps- kickoff-meeting with introduction to the tools- completion of the forms by the operator- meeting for verification and discussion of the results

13-9-2014

15


Results consequences for authorities1

Results – consequences for authorities

permit conditions related to EEsome authorities have developed a set of permit conditions for their installations

permit conditions become part of the inspections

exchange of information about dealing with EE in permit procedures is necessary

13-9-2014

16


Further developments

Further developments

  • test of the use of the project products for the renewal of permits (Arpa Lombardia)

  • test of the draft application form and the annexes in permit procedures (SH)

  • discussion of indicators / benchmarking with permit writers


Applicability of bat conclusions

Applicability of BAT conclusions

  • Focus on production of cement, iron and steel and manufacture of glass

  • Important that the item is part of the conclusions

  • EE chapters but give important input and orientation

  • For details permit writers have to use the BREF documents


Recommendations for future work

Recommendations for future work

Workshop on assessment of the application documents regarding EE

Development of a presentation for training on dealing with EE in permit procedures

Integrating the discussion on energy efficiency in other sector specific IMPEL-projects

Developing an online tool for energy data submission (e.g. electronic application form for EE)

Integrating EE in inspection work

13-9-2014

19


Energy efficiency as part of the integrated approach

Thank you for your attention !