“Nuclear Radiation, Environment and Energy” Workshop

“Nuclear Radiation, Environment and Energy” Workshop. General discussion on the Daya Bay contingency plan ( 大亞灣應變計劃 的通識 討論 ). 香港理工大學應用物理系 王碧裕. -50 km from Tsim Sha Tsui. Platform of spreading. -release of radioactive fission products ( 放射性裂變產物 ) into the atmosphere. radioactive plume

dougal
Download Presentation

“Nuclear Radiation, Environment and Energy” Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Nuclear Radiation, Environment and Energy” Workshop General discussion on the Daya Baycontingency plan (大亞灣應變計劃的通識討論) 香港理工大學應用物理系 王碧裕

  2. -50 km from Tsim Sha Tsui

  3. Platform of spreading -release of radioactive fission products (放射性裂變產物) into the atmosphere radioactive plume (輻射煙羽) Iodine-131Half-life: 8 days gaseous and volatile Ingestion of contaminated foodstuffs and drinking water Cesium-137 Half-life: 30 years Water-soluble

  4. TECHNICAL WORKING GROUP (技術工作小組) - Secretary for Security or his representative (Chairman) Decision on the activation level of the plan (決定應變計劃的動階段) • Technical advice from these key departments 2. IAEA four-category system (國際原子能機構的四級分類系統) (classifying nuclear power emergencies) 1. Plume Exposure Pathway Counter-measure (煙羽防護措施) 2. Ingestion Pathway Counter-measure (飲食防護措施)

  5. Counter-measures 1. Plume Exposure Pathway Counter-measure (煙羽防護措施) (a) Evacuation or sheltering (疏散或掩蔽) (i)Evacuation (疏散) -only apply to Ping Chau (坪洲) (within 20 kmof the nuclear plant) (ii)Sheltering (掩蔽)

  6. Counter-measures 1. Plume Exposure Pathway Counter-measure (煙羽防護措施) (b) Monitoring the radiation level (輻射水平監測)of - persons who have been within the 20 km range - incoming cargo (c) Issue of potassium iodate tablet (派發碘酸鉀藥片) 2. Ingestion Pathway Counter-measure (飲食防護措施) (a) Control of food and livestock (食物及禽畜管制) -1000 Bq/kg (b) Control of water (水質管制)

  7. Operational criteria for evacuation (IAEA)

  8. Major factors that affect the spreading of plume • Distance • Dilution by the atmosphere Air Dose Rate Readings on 17th March, 2011 =170.0µSv/hr

  9. Major factors that affect the spreading of plume • Distance • Dilution by the atmosphere Criteria for evacuation: > 297.62µSv/hr MODEL 1:

  10. Major factors that affect the spreading of plume • Distance • Dilution by the atmosphere MODEL 2: Spread in “sphere”

  11. Major factors that affect the spreading of plume • Distance • Dilution by the atmosphere Criteria for evacuation: > 297.62µSv/hr MODEL 2: Spread in “sphere”

  12. Uncertainties that affect the spreading of plume 1. Size of explosion 2. Weather (Wind, Rain) Rain:- rainfall greatly enhance the deposition rate → Radiation level in air ↓ Wind:- winddirection affectthedirection of dispersion - windspeed affecttherate of dispersion

  13. “First assessment indicates that one of the IAEA operational criteria for evacuation is exceeded in Iitate village.” --- IAEA

  14. Time for the evacuation zone to safety level Reference data: Akogi Teshichiro, Namie Town, Futaba County (双叶郡浪江町赤宇木手七郎) http://eq.wide.ad.jp/index_en.html (April 24th version -http://eq.wide.ad.jp/files_en/110424map_1800rev2_en.pdf) - 31km from Fukushima Dai-ichi Nuclear Power Plant Criteria for evacuation : > 297.62µSv/hr 17/3/2011 – 23/4/2011

  15. Time for the evacuation zone to safety level <11.42µSv/hr

  16. THE END