An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONTENTS Ⅰ. Quality assurance diagram ---------------- 3 Ⅱ. Quality performance record --------------- 4 Ⅲ. QA SYSTEM-------------------------------------- 5 Ⅳ. Certification ------------------------------------- 6 Ⅴ. Reliability ----------------------------------------- 7∼13 2/13

  2. 1. Quality assurance flow-chart Customer Sales. R&D Production QA Purchase Remarks Needs • Development & Design • Work instruction • First-piece report LPP CTQ Review Contact review Order Supplier’s evaluation & selection • Inspection • Measuring and test equipment Incoming Insp. Production Process control Non-conforming production Outgoing Insp. Traceability Corrective & preventive action Packing, Handling Delivery 3/13

  3. 2. Quality performance record 2.1 Air conditioners 2.2 Refrigerators 2.3 M.W.O 4/13

  4. 3. QA SYSTEM3.11st factory (Bucheon factory) - Approval ISO 9001:Version 2000 in Jun 16. 1995 From UL - Approval Q-plus Ⅱin July, 1996 from CLK and upgraded Q-plus Ⅲin May, 2003 from CLK 3.22nd factory (Incheon factory) - Approval ISO 9001/14001: in Feb.,1998 from BVQA 3.33rd factory (Yang San factory) - Approval ISO 9001: Version2000 in OCT. 20, 2001 from UL 3.4 4th factory (Qingdao factory) - Approval ISO 9001: Version2000 in Mar. 24, 2003 from UL (Yangsan factory) (Qingdao factory) 5/13

  5. 4. Certification 1) Test Lab. Status : UL Test Lab.approval From UL ; 02.6.30, 82㎡ 2) File status : Class”B” System file : 1 file 2 models Thermal protector type : 1 file 46 models Impedance protector type : 1 file 33 models Component type : 1 file 2 models CSA : 1 file 8 models DEMKO : 1 file 8 models TUV : 5 file 11 models 3) Approval period : Approval confirm within three weeks UL Only UL & CSA CSA VDE TUV DEMKO SEMKO CCC China 6/13

  6. 5. Reliability - Useful Test & measuring Equipment* Low to High Temperature test room (-25℃ ~ +50℃) * Heat shock & Low Temp (-100℃ ~ +200℃) - Verify R&D developed Sample - Short-term development & Low Cost - Ability of reliability test 1) Standard Safety Test – UL-WTDP Lab., TUV-ACT Lab. (UL&IEC Std.) 2) Life test (ALT, HALT Test) 3) EMC Test – Immunity (IEC61000 Series) 4) Insulation test : Torture, ALT(Accelerated lift test), UL746 Series Test 5) Other analysis System 7/13

  7. 5.1 Laboratory for reliability Low temp. room High temp. room Safety test room Life test room1 Life test room 2 8/13

  8. 5.2 Life test(1) 9/13

  9. 5.2 Life test(2) 10/13

  10. 5.3 ALT, HALT test 11/13

  11. 5.4 Insulation evaluation 12/13

  12. 5.5 Others 13/13