EUDET Beam Telescope: status of sensors for the demonstrator

EUDET Beam Telescope: status of sensors for the demonstrator. Wojciech Dulinski on behalf of IPHC. Outline Engineering run AMS-035 OPTO Mimo*3L tests results Mimosa18 (High Resolution Tracker) tests results PCBs status Conclusions and the status summary.

donal
Download Presentation

EUDET Beam Telescope: status of sensors for the demonstrator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EUDET Beam Telescope: status of sensors for the demonstrator Wojciech Dulinski on behalf of IPHC • Outline • Engineering run AMS-035 OPTO • Mimo*3L tests results • Mimosa18 (High Resolution Tracker) tests results • PCBs status • Conclusions and the status summary

  2. Layout of the reticle of the engineering run AMS-035 OPTO 07/2006 on 14 µm (standard) and 20 µm epi substrate Several devices of direct interest for EUDET: MimoTEL (256x256, 30 µm pitch), HRTracker (512x512, 10 µm pitch),Mimosa16 (binary readout prototype), MimoSTAR3L, ADC, test structures…

  3. MimoSTAR3L tests results • MimoStar3 (2 x 1 cm2) • Same pixel as in MimoStar2: Rad-tol Nwell diode • "Same" architecture design, but • More pixels (x 12.5) • 2 serial outputs at 50 MHz • 1 temperature monitoring probe • 1 ADC (1MHz) for testability • End of October, reception of engineering run • From November to end of 2006, two tests in parallel • Probe station setup preparation for wafer with 14 µm EPI • Laboratory test for circuits with 20 µm EPI • End of 2006 to Jan. 2007, dicing 14µm EPI wafer • Laboratory test for circuits with 14 µm EPI

  4. MimoSTAR3L tests results • Power ON + JTAG set test • High power consumption • Missing of HRES layer (high resistivity poly layer) • AMS did not respect one of specification (option) • Biasing DACs out of range • difficult to make circuit working at nominal conditions • Several iterations between post-simulations and tests plus a small modification on the PCB board: MimoStar3 can be set "near" nominal conditions

  5. MimoSTAR3L tests results: the summary MimoStar3: 20 µm EPI (results from 1 chip) MimoStar3: 14 µm EPI (results from 1 chip) • MimoStar3 with 14 µm EPI substrate seems to have less noise • Excess noise (at room temperature) comes from excessive dark current… • Comparison of M3 (14 µm EPI) and M2 (14 µm EPI) • Noise  (~ 10 %) • Calibration Peak  (~ 25%) • Yield problem (?)

  6. Mimosa18 tests results: calibration using Fe55 source(no HiRes poly in this design) 2,5 MHz (25 ms) • 10 MHz • (6.4 ms) • 10 MHz • (2.5 ms) Two chips calibrated, 3 others verified. All (on 20 µm epi) seems to work  an excellent yield result (?)

  7. Mimosa18 tests results: noise measurements • 2,5 MHz ENC = 16 е- • 10 MHz ENC = 12,3 е- • 25 MHz ENC = 15 е- As expected (roughly)…

  8. Mimosa18 tests results: “two-peak” spectrum from epitaxy photons 2,5 MHz (25 ms) • 10 MHz • (6.4 ms) • 10 MHz • (2.5 ms) Surprising, under investigation, to be compared with the standard wafer…

  9. MimotTEL testing: the beginning • JTAG alive- the rest also seems to work, with a similar performance as observed on MimoSTAR*L…

  10. Telescope PCBs and cables Beam area Control room Trigger PCB USB PP MimoTel (or HRTracker) on proximity PCB Auxiliary PCB Clock Tree Clock Root

  11. PCB’s status • Twenty PCB front-sets (MimoTEL + HRTracker + Auxiliary) ordered, 5 fully assembled and 5 MimoTELs + 5 HRTs bonded • Remaining fifteens transferred to DESY for the components mounting • For technical reasons, chip bonding refused by DESY workshop, all bonding will be done at Strasbourg • Five sets of clock distribution PCB’s produced, two sets assembled at Strasbourg, one set in use

  12. Conclusions/present status • Two wafers (14 µm and 20 µm epi) delivered and diced (wafer NOT thinned)- Preliminary tests of Mimo*L demonstrated non-conformity of process with the option specified for this run (missing HiRes layer)- Serious consequences (however not fatal) for Mimo*L and MimoTEL sensors- Preliminary tests confirms planned delivery schedule to EUDET collaboration- New run (re-processing using the same mask set) should start next week at AMS… For the binary sensor: see Marc’s talk