1 / 5

MICE Project Report

MICE Project Report. Paul Drumm VC 14 th September 2005. Technical. Target Scrutiny at the RAL CM Prototype test in beam in January Readiness review in November Benchmark pi-production vs beam loss Beam Line Optics new rates & beam sizes to be issued to PID group  CM13

donagh
Download Presentation

MICE Project Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE Project Report Paul Drumm VC 14th September 2005

  2. Technical • Target • Scrutiny at the RAL CM • Prototype test in beam in January • Readiness review in November • Benchmark pi-production vs beam loss • Beam Line • Optics • new rates & beam sizes to be issued to PID group •  CM13 • Solenoid by CM? • Cryogenics – kick-off meeting imminent

  3. Technical • RF • Aim single test stand • Test components for two systems • Availability issues with tubes • ISIS 116 tubes are being ring-fenced for ISIS • New 116 tubes available • need to buy & fabricate glass in next two years • expensive – tube made to order at market price • 170 tubes • Cern tube – low demand • available for ~ next year • no plan in place – depends on CERN’s attitude

  4. Management • FAC meeting 19th September • AB & PD representing & reporting on MICE • Membership: • R Wade – Chair, PPARC UK • LK Len - Office of High Energy Physics - Washington, DC • Randy Ruchti - NSF/eXP Particle Physics, USA • Franke Linde (?) - NIKHEF, Netherlands • Kenzo Nakamura (x) - KEK-IPNS, Japan • A Skrinsky (?) - BINP • Plus two (admin) PPARC UK

  5. Collaboration Meeting • As of 9am 14th – 25 registered • 11 UK XXXXXXXXXXX • 9 USA XXXXXXXXX • 2 JP XX • 1 CH X • 1 Italy X • 1 Netherlands X • Room availability: • deadline noon GMT 19th September • Thereafter at risk (& more work for debbie )

More Related