DuraPlate Installation Guide. Corrosion Resistant Liner. Presented By:. THINK SAFETY 1st. Practice ALL safety precautions. Follow all OSHA & Manufacturers safety recommendations. Wear protective gear. Step One. Prepare the Joints. Step 1 – Proper Storage.

Download Presentation

Presented By:

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Slide1 l.jpg

DuraPlate

Installation Guide

Corrosion Resistant Liner

Presented By:


Slide2 l.jpg

THINK SAFETY 1st

  • Practice ALL safety precautions.

  • Follow all OSHA & Manufacturers safety recommendations.

  • Wear protective gear


Slide3 l.jpg

Step One

Prepare the Joints


Slide4 l.jpg

Step 1 – Proper Storage

Use blocking to stage the joints OUT of the dirt

All materials and joints must be kept clean


Slide5 l.jpg

Step 1 – Clean the Joints

Clean the bell AND the spigot

Remove all dirt and debris


Step 1 inspect the joints l.jpg

Step 1 – Inspect the Joints

Inspect the Bell and Spigot

This is a good joint

Report cracks to your supervisor


Slide7 l.jpg

Step 1 – Prime the Joints

Best results are obtained with the application of a water- based adhesive primer


Slide8 l.jpg

Step Two

Install Joint Materials


Slide9 l.jpg

Step 2 – Install Joint Materials

Two Seals are required

Gaskets to keep the structure watertight

Mastic to keep back the gasses


Slide10 l.jpg

Step 2 – Apply Butyl to Shoulder

Apply ONELAYER of approved butyl tape


Slide11 l.jpg

Step 2 – Apply Butyl to Shoulder

Place butyl tape on the INSIDE shoulder of the structure


Slide12 l.jpg

Step 2 – Apply Butyl to Shoulder

Do NOToverlap the end of the butyl tape

Apply Gasket to Spigot


Slide13 l.jpg

Step 2 - Install O-Ring

PLACE on

SPIGOT

1

2

LUBE GASKET

1

2

3

4

EQUALIZE

INSPECT

4

3


Slide14 l.jpg

Step 2-Install Single Offset

1

2

PLACE ON SPIGOT

1

2

LUBE SPIGOT

with GASKET ON

3

4

EQUALIZE

INSPECT

4

3


Slide15 l.jpg

NOTE

For more detailed instructions on proper installation of the gaskets, please view

WATERTIGHT GASKET INSTALLATION GUIDE

Available from


Slide16 l.jpg

Step Three

Lubricate


Step 3 lubricate l.jpg

Step 3 – Lubricate

Lube inside the bell.

Do NOT put lube on top of butyl tape.


Step 3 lubricate the spigot l.jpg

Step 3 – Lubricate the Spigot

Insure the spigot has been lubed properly according to the type of the gasket.


Slide19 l.jpg

Step Four

Set Section


Step 4 select proper equipment l.jpg

Step 4 – Select Proper Equipment

Use of Proper Lifting Equipment

Promotes Safety

Prevents Damage to Structure

Eases Installation


Step 4 lifting apparatus l.jpg

Step 4 – Lifting Apparatus

Use proper lift pins and bars available from Atlantic


Step 4 machinery l.jpg

Step 4 – Machinery

Use machinery capable of lifting the structure.

Call our office for the weight of your structures


Step 4 set section l.jpg

Step 4 – Set Section

Keep the Structure Level

Center the Sections and Lower into Position


Step 4 set section24 l.jpg

Step 4 – Set Section

Squeeze out of the butyl tape should occur as the joints seat themselves


Slide25 l.jpg

Step Five

Visual Inspection


Step 5 visual inspections look inside and outside structure l.jpg

Step 5 – Visual InspectionsLook inside and outside structure

Make sure the joints are seated evenly all around


Step 5 visual inspections look inside and outside structure27 l.jpg

Step 5 – Visual InspectionsLook inside and outside structure

If the joints are not even, raise the section and adjust.

Use clean butyl


Step 5 visual inspections look inside and outside structure28 l.jpg

Step 5 – Visual InspectionsLook inside and outside structure

Plug lift holes with suitable non-shrink grout


Slide29 l.jpg

SUMMARY

  • SAFETY 1st

  • PREPARE THE JOINTS

  • INSTALL JOINT MATERIALS

  • LUBRICATE

  • SET PRECAST – INSURE LEVEL

  • INSPECT & PLUG LIFT HOLES


Slide30 l.jpg

Questions?

Duraplate

Installation Guide


Slide31 l.jpg

Troubleshooting

Use Lube GENEROUSLY

Keep Lift Hooks STRAIGHT


Slide32 l.jpg

Contact your Atlantic Sales Representative for other products available to promote watertight quality installations


Slide33 l.jpg

DuraPlate

Installation Guide


Slide34 l.jpg

Supporting Cast