MD 22 MULTIMODAL CORRIDOR STUDY

MD 22 MULTIMODAL CORRIDOR STUDY. MD 22 MUTIMODAL CORRIDOR STUDY. Purpose: Investigate and identify feasible and cost efficient transportation and safety improvements for the corridor. Funding: Cost Shared through Baltimore Metropolitan Council with 80% Federal Funds and 20% Local Match

dinh
Download Presentation

MD 22 MULTIMODAL CORRIDOR STUDY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MD 22 MULTIMODAL CORRIDOR STUDY

  2. MD 22 MUTIMODAL CORRIDOR STUDY Purpose: Investigate and identify feasible and cost efficient transportation and safety improvements for the corridor. Funding: Cost Shared through Baltimore Metropolitan Council with 80% Federal Funds and 20% Local Match Outcome: Series of short term, medium term and long term recommendations that include TDM strategies, access management, transit upgrades, bicycle and pedestrian accommodations, and other Complete Streets components.

  3. Study Area

  4. O-D Findings (AM)

  5. O-D Findings (PM)

  6. Road Safety Audit Findings

  7. Short Term(2012 – 2020)

  8. MediumTerm(2020 – 2030)

  9. MediumTerm(2020 – 2030)

  10. Long Term(2030 – 2040)

  11. IMPLEMENTATION