development of renewable energy
Download
Skip this Video
Download Presentation
Development of renewable energy

Loading in 2 Seconds...

play fullscreen
1 / 7

Development of renewable energy - PowerPoint PPT Presentation


  • 96 Views
  • Uploaded on

Development of renewable energy. A chance and a challenge for Poland. CONTINENTAL WIND PARTNERS & PS WIND MANAGEMENT LEADING WIND DEVELOPER. CWP has over 4 GW under development as well as a proven track record of execution across the region.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Development of renewable energy' - dimaia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
development of renewable energy

Development of renewable energy

A chance and a challenge for Poland

continental wind partners ps wind management leading wind developer
CONTINENTAL WIND PARTNERS & PS WIND MANAGEMENTLEADING WIND DEVELOPER

CWP has over 4 GW under development as well as a proven track record of execution across the region

  • CWP is a leading developer of wind projects in Central Europe and Australia & New Zealand. The company has 4 GW of capacity under development across five countries.
  • CWP was established in 2007. Since then, CWP has developed and sold Europe’s largest wind farm (600 MW)
  • CWP is extending its activities to fast growing new markets like Turkey and Bulgaria.
  • CWP employs over 40 people across Europe and the Asia-Pacific region and cooperates with both international companies and its local advisors.
  • Continental Wind Partners’ investors comprise institutions and high net worth individuals based in the US and Europe.

Existing Markets

Poland

700 MW

Romania

1100 MW

Australia

1800 MW

PL

AU

Prospective Markets

RO

HR

Croatia

240 MW

BG

Bulgaria

320 MW

TK

Turkey

600 MW

2

slide3

POLAND IS AN ATTRACTIVE MARKET FOR RENEWABLE ENERGY INVESTMENTS

CHANCE

The main incentives for development of renewable energy projects in Poland are:

  • A good and stable Green Certificate system supporting renewable energy sources
    • Current spot market price close to the substitution fee (currently 248,5 PLN)
    • Total price for „black” energy and green certificates ~85 EUR
  • Good conditions for development of renewable energy
      • (Wind, Biomass, Biogas)
  • Growing demand for electricity

Poland has good windconditions, not only in the northern regions

slide4

GRID CONNECTION

CHALLENGE

    • Technical barriers
      • Weak grid in the windiest regions
      • Problems with balancing due to dominating of coal fired production
    • Changing and unclear regulations for obtaining grid connection conditions
      • Thousands MW of virtual projects
      • Blocking grid capacity – a way to block competition
      • Grid Operator flooded with applications
      • Delays in delivery of necessary grid data
      • Highly overstated grid modernization requirements
  • High costs of grid connection
      • Tendency to surcharge the wind developers with additional costs of

grid upgrades

  • Bureaucracy
      • Long process of getting grid connection conditions and
      • Long, costly and bureaucratic process of signing a grid connection agreement

Many good projects fail because they cannot connect to the grid

slide5

REGULATIONS

CHALLENGE

    • Environmental Regulations
      • Lack of clear standards for environmental procedures.
      • Constantly changing regulations
  • Zoning Plans
      • Changing or creating the Zoning Plan is a long (usually at least a year), costly and bureaucratic procedure
  • Structure of landownership
      • The plots are very small in most of the country and the process off leasing and acquiring necessary land is very time consuming and difficult
      • The big plots very often belong to the Agricultural Agency and the tender process required to lease from the Agency is bureaucratic and long

Development of renewables requires a stabile and efficient legal system

slide6

PROPOSED SOLUTIONS

CHANCE

Cooperation between governmental authorities, grid operator and RES developerss is needed

  • Grid
    • Modernization of the grid taking into account the future development of

renewable energy

    • Clear rules of issuing Grid Connection Conditions
    • Combining different energy sources which allows for storage and efficient

balancing of energy

  • Environmental Regulations
    • Creating clear standards for environmental procedures
  • Zoning Plans and Permitting Process
    • Changing the current regulations
    • More transparent and shorter procedures
slide7

CONCLUSIONS

The grid is the key to successful development of RES in Poland

  • Poland has big potential for wind energy development
  • The big challenge is to solve the main problem – GRID
  • Solving all other problems will not allow the renewable industry to move forward