Citizens Advisory Committee State College, Pennsylvania August 13, 2004. Susquehanna Sediments. Historic highs: 9 million tons per year Current transported load: 3.1 m/tons Lower Susq dams: 50-70% trapping efficiency Net delivered load to Bay: .9 to 1.1 m/tons

diella
Download Presentation

Citizens Advisory Committee State College, Pennsylvania August 13, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Citizens Advisory Committee State College, Pennsylvania August 13, 2004

  2. Susquehanna Sediments • Historic highs: 9 million tons per year • Current transported load: 3.1 m/tons • Lower Susq dams: 50-70% trapping efficiency • Net delivered load to Bay: .9 to 1.1 m/tons • Net delivered load 1985: 1.178 m/tons • Net delivered load 2002: 1.060 m/tons

  3. 3,100,000 tons sediment AVERAGE ANNUAL 75,000 tons nitrogen INPUT TO RESERVOIR SYSTEM 4,350 tons phosphorus Percentage trapped in reservoir system: Safe Harbor Dam SEDIMENT 70% Holtwood Dam 2% AVERAGE ANNUAL NITROGEN AMOUNT TRAPPED IN RESERVOIR SYSTEM 2,210,000 tons sediment (70%) Conowingo Dam 1,500 tons nitrogen (2%) 1,740 tons phosphorus (40%) 40% PHOSPHORUS 890,000 tons sediment AVERAGE ANNUAL 73,500 tons nitrogen OUTPUT TO CHESAPEAKE BAY 2,610 tons phosphorus

  4. Storage Capacity Status • Conventional estimate 17-20 years • With assumptions: 20-30 years 1. 10% decrease in transported load 2. Statistically expected scour 3. Trapping efficiency of 60%

  5. 1985 Sediment Loads • Bay-wide: 5.8 m/tons • Susquehanna: 1.2 m/tons (20%) • James River: 1.3 m/tons (22%) • Potomac: 2.0 m/tons (35%)

  6. 2010 Cap Load Allocations • Bay-wide: 4.15 m/tons • Susquehanna: 0.96 m/tons • James River: 0.94 m/tons • Potomac: 1.49 m/tons

  7. Moving Forward • C2K: “By 2003, work with the SRBC and others to adopt and begin implementing strategies that prevent the loss of the sediment retention capabilities of the lower Susquehanna River dams.” • Pennsylvania tributary strategy: 1.1 m/tons with full implementation

  8. Lingering Issues • Reservoir feasibility study • What about the wild cards? - scour - episodic nature of precip - flow and bank loss - system storage and the great purge • Stay the course, but manage expectations

  9. The Water Quantity-C2K Connection:The Implications of Flow for Water Quality and Vital Habitat Protection and Restoration

  10. Basin Overview • 27,510 square mile watershed. • 32,000+ miles of streams. • Normal Flow of Susquehanna River is 18 million gallons per minute at Havre de Grace, MD. • Susquehanna River is largest tributary to Chesapeake Bay. • Population of 4.2 million

  11. Project Review Regulations • Consumptive Water Use > 20,000 gpd • Surface-Water Withdrawals > 100,000 gpd • Ground-Water Withdrawals > 100,000 gpd

  12. Surface-Water Withdrawals • Regulatory threshold; 100,000 gpd • Protection of instream/downstream uses • Conservation releases • Passby flow requirements • Cold water fisheries – IFIM analysis • Warm water fisheries – 20 % ADF

  13. Groundwater in the Susquehanna Basin • Nearly 69 billion gallons. • Most of the potable water is within 300 ft of ground surface. • Groundwater supplies stream flow, upwards of 90% of base flow during extended droughts. • Withdrawing groundwater results in about a 1-to-1 reduction in flow downstream.

  14. Drought Years • 1991 • 1995 • 1997 • 1998 • 1999 • 2002

  15. Groundwater in the Susquehanna Basin • Over 50% of the basin’s population uses groundwater for water supply • To date, SRBC has approved the withdrawal of more than 232 million gpd of groundwater.

  16. Groundwater Use in the Susquehanna Basin (1995 data) • Water Supply 195 mgd = 50% • Mining 90 “ = 23% • Industrial 48 “ = 12% • Agriculture 42 “ = 11% • Other 16 “ = 4% • Total 391 mgd

  17. Ground-Water Withdrawals • Regulatory threshold; 100,000 gpd • Avoid impacts to resource and other users • Pump test guidance • Ground-water availability analysis • 48-hour constant-rate pump test

  18. Consumptive Water Use • Regulatory threshold; 20,000 gpd • Water used and not returned to the basin • Out-of-basin diversions • Compensation requirements

  19. Compensation Options For Consumptive Water Use • Discontinuance • Releases from storage • Payment into the Water Management Fund • 30,000 acre/ft of pooled water storage

  20. Moving Forward • Warm Water IFIM • Groundwater Management Plan • PA Act 220 State Water Plan • Water Budgeting • Protected Area Designations