slide1
Download
Skip this Video
Download Presentation
Summer 2012

Loading in 2 Seconds...

play fullscreen
1 / 4

Summer 2012 - PowerPoint PPT Presentation


  • 99 Views
  • Uploaded on

Summer 2012. A Brief Review of Technology Upgrades at Mead Hall. 11.10.2012 Technology Committee Meeting. Aiken Prep Network Infrastructure. Installed HP Procurve 4000m as core switch Located and identified edge switches Replaced faulty edge switches Simplified topology

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Summer 2012' - dewei


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Summer 2012

A Brief Review of Technology Upgrades at Mead Hall

11.10.2012 Technology Committee Meeting

aiken prep network infrastructure
Aiken Prep Network Infrastructure
  • Installed HP Procurve 4000m as core switch
  • Located and identified edge switches
    • Replaced faulty edge switches
    • Simplified topology
  • Installed pfSense router / firewall
  • Established IPSec VPN tunnel connecting campuses
  • WiFi APs
    • Installed additional AP
    • Corrected and matched configuration an all APs
servers and services
Servers and Services
  • Mead Hall Domain
    • Domain Membership for all PCs at each campus
    • Local domain controller at each campus
    • Elevated domain functional level to 2003 (soon 2008)
  • Hyper-V Server 2012 Hosts
    • Aiken Prep (production)
      • 2008 R2 domain controller
      • 2012 file server
    • St. Thaddeus (in progress)
      • 2008 R2 domain controller
      • 2012 file server
future upgrades
Future Upgrades
  • High bandwidth link between campuses
  • WiFi network enhancement at both campuses
  • Raise domain functional level to 2012
ad