Iowa Department of Transportation

State and Local Partnership in Research. Iowa Department of Transportation. IHRB RESEARCH PROGRAM OVERVIEW COUNTY ENGINEERS RESEARCH FOCUS GROUP SHORT SPAN PRECAST BRIDGE STANDARDS. OUTLINE. Research. Program Overview.

devon
Download Presentation

Iowa Department of Transportation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. State and Local Partnership in Research Iowa Department of Transportation

  2. IHRB RESEARCH PROGRAM OVERVIEW COUNTY ENGINEERS RESEARCH FOCUS GROUP SHORT SPAN PRECAST BRIDGE STANDARDS OUTLINE

  3. Research Program Overview

  4. 1949 – Legislature established the Secondary Road Research Fund in the Iowa Code • Iowa DOT has oversight of the funds • Highway Commission allocated funding for Primary Road Research • IHRB – advisory board to the DOT • 1989 – Legislation allocates municipal funds for city Iowa Highway Research Board

  5. 15 members • 7 County Engineers • 4 Iowa DOT • 2 City Engineers • 2 University Representatives • Alternate members IHRB…

  6. IHRB (State) ~ $2.2M • ~ $1.2M County • ~$750K State • ~$200K City Breakdown Funding Sources

  7. Areas of Research: • Aggregate and Geotechnical • Pavement Management/Engineering Data • R.O.W/Roadside Management • Hydraulics/Hydrology/Drainage • Materials • Maintenance • Pavements • Policy, Specs, Economic, Legal • Bridges and Structures • Social/Environmental • Traffic and Safety, Operations Focus of Research program

  8. COUNTY ENGINEERS RESEARCH FOCUS GROUP

  9. To provide a forum to share day to day challenges - Round Table Discussions Share low-cost, innovative solutions to meet these challenges Brainstorm and prioritize ideas for possible research projects – IHRB Goals…

  10. Standards for abutments for precast bridges Scope of the project evolved to include other precast elements to creating a set of standards for complete precast short span bridges. Standards For Short Span Bridges

  11. 24'-0 to 30'-0 wide roadway Skews 0º-0, 15º-0, and 30º-0 Span Lengths 30’-0, 40’-0, 50’-0, 60’-0, 70’-0 – Precast Concrete beams (prestressing only in spans which require it) Consider voided box beams Consider the weight of the beams due to concerns with moving and placing the beams when weights start to exceed 45,000 lbs. Beams could be strengthened transversely with threaded rod. Precast abutments as well as details for option to do cast-in-place abutments on pile foundations. Short Span Bridges

  12. TR-663 – Short Span County Precast Bridge Standards – 3 phases • Consultant Develop Concept • ISU Bridge Center to test any details if needed • Develop Full set of standards

  13. Vanessa Goetz Secondary Road Research Research and Analytics, Iowa DOT 515-239-1382 Vanessa.goetz@dot.iowa.gov Thanks!