An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementing Committee MeetingMay 15th, 2014New BraunfelsMS4 program and the HCP

  2. Storm Water Permit Update • Storm water regulations and the Texas Pollutant • Discharge Elimination System (TPDES) • Municipal Separate Storm Sewer System (MS4) • Federally mandated permit and program • requirements • Storm Water Management Plan (SWMP) • Minimum control measures and • implementation

  3. Permit Requirements • Storm Water Management Program (SWMP) • Submit Notice of Intent (NOI) • Annual Reports

  4. Program Requirements • Storm Water Management Plan (SWMP) and Minimum Control Measures (MCM) • Public Education, Outreach, and Involvement • Illicit Discharge, Detection and Elimination • Construction Site Storm water Runoff Control • Post-Construction Storm water Management in New Development and Redevelopment • Pollution Prevention/Good Housekeeping for Municipal Operations

  5. MCM 1: Public Education, Outreach and Involvement • Best Management Practices: PE-1: Stormwater Educational Materials and Strategies PE-2: Public Participation and Involvement Programs PE- 3: Partnerships with Other Institutions and Organizations – Alligator/Geronimo WPP, EA HCP, etc. PE-4: Presentation to Local Elementary Schools PE-5: “Love your Park” Volunteer Program PE-6: Tree City USA Program

  6. MCM 2: Illicit Discharge Detection and Elimination Best Management Practices: ID-1: Storm Sewer Mapping ID-2: Detection and Elimination Program ID-3: Field Staff Training ID-4: Public Reporting of Illicit Discharges and Spills ID-5: Illicit Discharge Ordinance ID-6: River Cleanup

  7. MCM 3: Construction Site Storm water Runoff Control Best Management Practices: CS-1: Construction Site Inspection Program CS-2: Construction Site Inventory CS-3: Construction Site Waste Control Ordinance CS-4: Construction Site Runoff Control Ordinance

  8. MCM 4: Post-Construction Storm water Management in New Development and Redevelopment Best Management Practices: PC-1: Staff Training PC-2: Post-Construction Development Review Procedures – evaluation/establishment of structural measures to enhance stormwater quality PC-3: Long-Term Operation and Maintenance PC-4: Storm water Management Ordinance for New Development and Redevelopment PC-5: Encouragement of Low Impact Development Designs PC-6: Establish No-Mow Zones

  9. MCM 5: Pollution Prevention/Good Housekeeping for Municipal Operations Best Management Practices: GH-1: Operations and Maintenance: Street Sweeping GH-2: Mapping of Facilities and Inventory Control GH-3: Municipal Operations and Facility Survey GH-4: Facility Inspection Program GH-5: Good Housekeeping Operations – Outdoor Storage GH-6: Fleet and Equipment Maintenance GH-7: Vehicle and Equipment Washing GH-8: Landscaping GH-9: Structural Control Maintenance GH-10: Spill Prevention and Response GH-11: Employee Training Program GH-12: Green Waste Management

  10. Annual Report Requirements • The report must include: • Status of compliance; • Summary of results analyzed; • Summary of activities; • Proposed changes to SWMP; • Description and schedule for additional BMP implementation; and • Any agreements with other MS4s. Source: TPDES General Permit No. TXR040000

  11. Impacts • Residential and Development • Existing Residential homes and lots • No impact • New and Redevelopment ( 1 acre) • Construction – SWPPP still required • First .5” rain water quality requirement (Drainage Criteria Manual anticipated update)

  12. Manpower requirements • PositionsFTE’s • Watershed Manager 0.50 • Watershed Coordinator 0.50 • Inspector 1.50 • Admin 0.50 • Total FTE’s needed to support MS4 program 3.00

  13. Cost Analysis (yearly)

  14. Low Impact Development (LID) & MS4 • What is LID? • LID in the HCPis an incentives based program that allows citizens to participate in improving the quality of the runoff that occurs in and around watersheds draining to Landa Lake. • How does LID in the HCPdiffer from MS4? • LID program in the HCP concentrates on opportunities for stormwater quality enhancement in areas draining to critical habitats. The MS4 program is a city wide city funded program.

  15. LID focus • Public education is focused on citizens within watersheds draining to critical habitats • Long term establishment of program efficiencies based on water quality monitoring • Rebate program for LID features in areas just upstream of critical habitats • Website development of the habitat and LID education relationship • Pilot and Test projects • BMP’s • New technologies for improving water quality

  16. Impervious Cover / Water Quality / LID • Budget • Table 7.1 $ 100,000 • 2014 WP $ 100,000 • No identified decisions or deviations

  17. Impervious Cover / Water Quality (WQ) / Low Impact Development (LID) • 2013 work plan activities • Beginning stages of the creation of the overall LID plan through public involvement and meetings with City of New Braunfels • 2014 work plan • Further development of LID/WQ program in watersheds draining to critical habitats • Implementation of the LID/BMP program utilizing public involvement and feedback

  18. QUESTIONS ?