An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Thailand:The Saraburi Dairy Farming Project

  2. Background • Began in 1984 to encourage dairy farming among women in Muek Lek land area in the Saraburi Province in Central Thailand • Result of cooperation between the Svita Foundation, the Bangkok Bank, the Thai Institute of Scientific Research and the Saraburi provincial administration.

  3. Activity Profile • Muek Lek Region Crop Profile • 82% Maize (Production) • 17% Mungbean and Soybean (Production) • 1% Rice (Family consumption) • Average Net Income of 10, 000 Bt ($270.00)

  4. Activity Profile: Production

  5. Activity Profile: Reproduction

  6. Access and Control Profile: Resources

  7. Access and Control Profile: Benefits

  8. Analysis of FactorsInfluencing Access and Control • Economic Conditions: Average Family Income: 10,000 Bt ($270.00) • Poor but not impoverished area • Families could borrow money at a 20% interest rate which, although steep, helped many make it through times of drought

  9. Analysis of Factors: • Thai government appeared to support increased milk production within the country • Limited dairy imports • Forced dairy companies to purchase 10 units of local milk for every unit of imported powder

  10. Analysis of Factors • Demand for milk: • Between 1972-1982, the demand for milk grew 25% every year. • In 1983, production of milk lagged behind production.

  11. Summary of Muek Lek Prior to Dairy Project • Women andmen share the productive and reproductive labor • Men have more control of resources and benefits • The majority of farmers are poor • The demand for milk is high and the government supports local production.

  12. The Project Cycle AnalysisWomen’s Role in Project Identification Women's Needs • Increased production without travel time • Increased control if the cows and income belonged to the women • A project that can be streamlined to the current product demands of the surrounding area.

  13. The Project Cycle AnalysisWomen’s Role in Project Identification Women’s Needs - In Saraburi, women and men were consulted at the preliminary stages of project planning.

  14. The Project Cycle AnalysisWomen’s Role in Project Identification Defining General Project Objectives - The project objectives were explicitly related to and adequately reflect women’s needs Increased Access: cows do not need to graze so they will be near home. Increased Control: Women will be in control of production and, hopefully, profit.

  15. The Project Cycle AnalysisWomen’s Role in Project Identification • Defining General Objectives • A a number of local women participated in setting objectives. • Earlier efforts to get dairy production off of the ground in Thailand did not involve a women’s initiative.

  16. The Project Cycle Analysis Women’s Role in Project Identification • Defining General Objectives • Lessons from earlier programs: • In 1960’s – Thai/Danish dairy project began and by 1980’s was experiencing some difficulties • Low yields from cross-bred cows/Lack of infrastructure • New project would include imported cows that would produce a higher yield.

  17. The Project Cycle AnalysisWomen’s Role in Project Identification • Possible Negative Effects • The only negative effects could be a women borrowing from the bank to buy a cow and then encounter difficulty in raising it. • In the study, one women’s cow died but she was able to recover financially by purchasing another one and making a profit.

  18. The Project Cycle AnalysisWomen’s Dimension in Project Design • Project Impact on Women’s Activities • The project affects production and, in turn, reproduction. • The project does not plan to change the women’s locus of activity. • This is not a missed opportunity for women’s role development because of how the local women respond to the increased income.

  19. The Project Cycle AnalysisWomen’s Dimension in Project Design • Impact on Women’s Access and Control • Women will have access and control of their cows (resources) • This does not necessarily mean that the women will control the benefits.

  20. The Project Cycle AnalysisWomen’s Dimension in Project Design Implementation • Personnel • The project is sufficiently aware of and sympathetic to women’s needs. • Women are involved at every level of project implementation. • Training: 71% of those trained were women

  21. The Project Cycle AnalysisWomen’s Dimension in Project Design Implementation • Organizational Structures • The organizational form does enhance women’s access to resources • Money • Cows • Supplementary Materials

  22. The Project Cycle AnalysisWomen’s Dimension in Project Design Implementation • Organizational Structures • The organization does have the power to to obtain resources needed by women from other organizations. • The Thai government is backing the project and is invested in its outcome. • There is the financial capability to help the women through the transition process.

  23. The Project Cycle AnalysisWomen’s Dimension in Project Design Implementation • Operations and Logistics: • Delivery channels are accessible to women. • The feed mill is in the village and is operated by the dairy farmers. • There are NOT mechanisms in place to make sure that the project resources and benefits are not usurped by males. (Mill) • Free veterinary services

  24. The Project Cycle AnalysisWomen’s Dimension in Project Design Implementation • Finances • Funding levels are adequate for program continuity • Bangkok Bank and the Women’s World Banking • It is possible to trace the funds for the women from allocation to delivery with a fair degree of accuracy.

  25. The Project Cycle AnalysisWomen’s Dimension in Project Design Implementation • Flexibility • There does not seem to be a management information system that helps to detect the effects of project on women. • There does seem to be flexibility within the project to adapt.

  26. The Project Cycle AnalysisWomen’s Dimension in Project Implementation • Data Requirements: • Tools in put in place to measure financial data: • Maize Farming: 10,000 Bt (270 USD) • Dairy Farming:37,000 Bt (999 USD)

  27. The Project Cycle AnalysisWomen’s Dimension in Project Implementation • Collection and Analysis: • There is not a mechanism in place to measure impact on women. • The project was largely established to augment female farmer’s income and so the measurement stops with the finances.

  28. The End