An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Whitetail Gas Storage Project December, 2007

  2. Tarpon Gas Storage, LP

  3. Tennessee Gas Pipeline Texas Eastern Pipeline Target Area for Tarpon Whitetail Gas Storage Tarpon Whitetail Gas Storage WGS Mississippi Jackson • Depleted Gas Reservoir Opportunity • Strong water drive reservoir located in the Black Warrior Basin • Reservoir Depth: ~ 3,400 - 3,600 feet • Approximate Working Gas Capacity: ~9.0 BCF Texas Eastern Sonat Tennessee

  4. Whitetail Gas Storage Overview • Depleted Gas Storage Reservoir near the City of Aberdeen in Monroe County (NE Mississippi) • Gas Storage Services on Texas Eastern Transmission, LP (TETCO) • Highest Standards of Safety and Environmental Impact Mitigation • Working Gas Capacity: ~9 BCF (depending on approved Pressure Gradient)

  5. Storage Services Contemplated • Firm Leasing • Interruptible Park & Loan • Firm Park & Loan • Service Open Season in December

  6. Whitetail Reservoir and Facilities • Fourteen Injection/Withdrawal Wells on 2 Well Pads • Construction of ~1 Mile of 16” Diameter Intra-Site Pipeline • Installation of Compression and Related Surface Facilities • Construction of ~5 Miles of 24” diameter West Header Pipeline • Interconnection with TETCO South of Egypt Compressor Station

  7. Whitetail Development Timeline File FERC 7 (c) Certificate Target Date: 12/17/07 Begin Construction Jul 2008 Gas Storage Field viability April 2007 Fully Operational April 2009

  8. Whitetail Attributes • Depleted Reservoir with Good Deliverability Characteristics (Multiple Cycles per Year) • Geographical Location Reduces Delivery Disruptions from Hurricanes • Safety Advantages associated with Depleted Reservoir • Rural Site (Mostly Cultivated Fields) • Economic Benefits to Monroe County

  9. Whitetail Project Status • Tarpon Whitetail Licensed to Operate in MS • Reservoir Optimization Analysis Underway • Pressure Gradient Will Impact Outcome • Civil Engineering Work On-going • Surface Equipment Specified/Bid • Developing Sub-Surface Program • On-site Well Analysis Complete • Discussing Transfer of Inactive Wells • Existing Well Re-entry • New Injection/Withdrawal Wells