City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting

City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010. Agenda Recent Flood Fight Strategy (2009/2010) 2010/11 Proposed City Flood Risk Management Projects Assessment of Flood Risk Overview of Project Project Schedule / Financing.

derica
Download Presentation

City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010

  2. Agenda Recent Flood Fight Strategy (2009/2010) 2010/11 Proposed City Flood Risk Management Projects Assessment of Flood Risk Overview of Project Project Schedule / Financing Meadow Creek Flood Risk Management

  3. Agenda Recent Flood Fight Strategy (2009/2010) 2010/11 Proposed City Flood Risk Management Projects Assessment of Flood Risk Overview of Project Project Schedule / Financing Meadow Creek Flood Risk Management

  4. 2009 Spring Flood – Meadow Creek Drive

  5. 2009 Spring Flood – Meadow Creek Area

  6. 2009 Flood Information • Probabilistic Stage Predictions as of 3/11/2009 • Actual Crest 3/28/2009 Approx. 50% Chance of 38-ft 10% Chance of 40-ft Actual Crest 40.8- ft Approx. 50% Chance of 36.0-ft and 10% Chance of 38.5-ft

  7. 2010 Flood Information • Probabilistic Stage Predictions as of 3/9/2010 • Actual Crest – 3/21/2010 Approx. 50% Chance of 38.0-ft and 10% Chance of 42.7-ft Actual Crest 36.99-ft Approx. 50% Chance of 36.0-ft and 10% Chance of 38.5-ft

  8. Current Flood Fight Strategy

  9. 2009 Flood Fight - Meadow Creek Drive

  10. Sandbagging Effort

  11. Agenda Recent Flood Fight Strategy (2009/2010) 2010/11 Proposed City Flood Risk Management Projects Assessment of Flood Risk Overview of Project Project Schedule / Financing Meadow Creek Flood Risk Management

  12. Potential Flood Risk Reduction Projects. • Total Est. Cost $35 Million

  13. Agenda Recent Flood Fight Strategy (2009/2010) 2010/11 Proposed City Flood Risk Management Projects Assessment of Flood Risk Overview of Project Project Schedule / Financing Meadow Creek Flood Risk Management

  14. Assessment of Flood Risk Insert Map Sandbag Estimate – 7,600 River Stage 37.0ft

  15. Assessment of Flood Risk Insert Map Sandbag Estimate – 32,800 River Stage 38.0ft

  16. Assessment of Flood Risk Insert Map Sandbag Estimate – 79,300 River Stage 39.0ft

  17. Assessment of Flood Risk Insert Map Sandbag Estimate – 138,300 River Stage 40.0ft

  18. Assessment of Flood Risk Insert Map Sandbag Estimate – 221,100 River Stage 41.0ft

  19. Assessment of Flood Risk Insert Map Sandbag Estimate – 314,900 River Stage 42.0ft

  20. Assessment of Flood Risk Sandbag Estimate – 375,000 Insert Map FEMA 100-yr Flood Stage 39.5 USACE Recent Evaluation – 1% Flood in Fargo is 42.4? River Stage 42.5ft

  21. Agenda Recent Flood Fight Strategy (2009/2010) Assessment of Flood Risk Overview of Project Project Schedule / Financing Meadow Creek Flood Risk Management

  22. Low Flow Storm Sewer Extension and Channel Re-grade Earthen Flood Control Levees to RS 43+1ft Permanent Storm Water Pond Channel Relocation Completion of Timberline Levee Bike Path (East and West) Low Flow Storm Sewer Extension

  23. VISUALIZATION

  24. Agenda Recent Flood Fight Strategy (2009/2010) Assessment of Flood Risk Overview of Project Project Schedule / Financing Meadow Creek Flood Risk Management

  25. Preliminary Construction Cost Estimate: Approximately $2.0M Preliminary Funding Plan City of Fargo Flood Control Sales Tax ND State Water Commission (50%) Potential Special Assessments Project Schedule / Financing

  26. Conceptual Planning Preliminary Geotechnical Review Preliminary Design City/Park District Meetings Public Informational Meeting(tonight) Detailed Geotechnical Analysis Hydraulic Analysis / Impacts Final Plans / Specifications / Cost Estimates Permitting Construction Bidding Anticipated Construction Begins (Fall 2010) Project Schedule / Financing

  27. Comment Form

  28. Meadow Creek Area Flood Risk Management – Project 5944 Questions / Discussion www.cityoffargo.com\Engineering