2013 CREA Energy Innovation Summit 2 MW Solar Project. Location of Project. Hwy 7 & Colo Blvd in Adams County. Electricity Production. Hangar 160 Solar Field Commissioned Dec 2012 Maximum Output – 2 MW Energy Output 3,400 MWh / yr 0.25% of United Powers annual energy needs

Download Presentation

2013 CREA Energy Innovation Summit 2 MW Solar Project

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


2013 crea energy innovation summit 2 mw solar project

2013 CREAEnergy Innovation Summit 2 MW Solar Project


Location of project

Location of Project

  • Hwy 7 & Colo Blvd in Adams County


Electricity production

Electricity Production

Hangar 160 Solar Field

  • Commissioned Dec 2012

  • Maximum Output – 2 MW

  • Energy Output

    • 3,400 MWh /yr

    • 0.25% of United Powers

      annual energy needs

    • Supply 300 -350 homes/yr


Generation overview

Generation Overview

  • 7,600 solar panels

    • 300 watts (DC) / panel

    • 25 yr warranty

  • Racking System

    • Wind tested – 120 mph

    • All Steel

  • RPS Station

    • (2) Inverters – 1,000 V UL

    • 1.85 MVA Transformer

  • Combiner Box

    • 19 panel strings

    • 400 panels / string

  • Monitoring

    • Real-time

    • @ Individual string level


Solar overview

Solar Overview

Capacity Factors

  • Solar 18 to 20 %

  • Wind 35 to 45 %

  • Baseload 85 to 95 %


Business case

Business Case

  • Renewable Resource

    • 3 to 1 multiplier

    • 0.73 % of RPS

  • Local Contractors

    • Samuel Engineering

    • HT Solar - Mechanical

    • E Light - Electric

    • Atlas Landscaping

  • Construction

    • 3 Months / Oct - Dec

    • Primary Metered

    • Realtime data – connected to SCADA

Hangar 160 Solar Field

kwh

$$

United Power

kwh

$$

Tri-State Policy 115Bill Credit Option


C ommunity

Community

  • Good for the Environment

    • Reduces CO2 Emissions by 5,000 metric tons

    • Equivalent to planting 750 trees or taking 750 cars off the road

  • Good for the Economy

    • Local generation creates local

      construction jobs

  • Good for United Power

    • Cost of Energy is predictable

      and stable

    • Helps meet RPS requirements

    • Net benefit to all co-op members


Renewable generation rps

Renewable Generation & RPS

  • Continue to develop projects that benefit overall membership

  • Enhances community presence and co-op reputation

  • Provides hedge against rising energy prices

  • Needed to meet higher RPS requirements

  • Working with Tri-State to develop these small DG projects