DCS WG report: from dreams to reality

DCS WG report: from dreams to reality. A fter Technical Run considerations. Main difficulties identified during TR Unstable and unreliable middleware (OPC servers) Worsening of the situation with increasing of complexity of the system and number of channels

derex
Download Presentation

DCS WG report: from dreams to reality

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCS WG report:from dreams to reality FV

  2. After Technical Run considerations VF • Main difficulties identified during TR • Unstable and unreliable middleware (OPC servers) • Worsening of the situation with increasing of complexity of the system and number of channels • Basic control of whole system is better than sophisticated control of a part • Our resources are limited and job should be better planned

  3. IT: ORACLE DB Main DCS hard- and middleware in TR PVSS 3.8 Advanced control for LKr Simplified control for the others Rudimentary LAV FE control WIENER FE crates OPC servers and other middleware LKr LV control CAEN HV 2012 CAEN FE crates RICH FE control STRAW HV & LV LAV FE control CHANTI PS KTAG FE control 2013 MPOD Hardware LV control HV and LV control FE control FE control FE control: 3 FE control WIENER FE crate WIENER FE crate WIENER FE crates: 5 WIENER FE crates: 4 WIENER FE crates: 3 WIENER FE crate WIENER FE crate CAEN FE crates: 32 CAEN HV CAEN HV CAEN HV: 1,2 CAEN HV CAEN HV: 4 MPOD: 4 CAEN HV: 3 PS (?) STRAW LAV LKr RICH CHANTI CEDAR MUV CHOD VF

  4. IT: ORACLE DB Main DCS hard- and middleware evolution Win CC OA 3.11 WIENER FE crates OPC servers and other middleware LKr LV control CAEN HV 2013 CAEN FE crates RICH FE control STRAW HV & LV LAV FE control CHANTI PS KTAG FE control MPOD Hardware LV control HV and LV control FE control FE control FE control: 12 FE control WIENER FE crate WIENER FE crate WIENER FE crates: 5 WIENER FE crates: 4 WIENER FE crates: 12 WIENER FE crate WIENER FE crate CAEN FE crates: 32 CAEN HV CAEN HV CAEN HV: 1,2 CAEN HV CAEN HV: 4 MPOD: 4 CAEN HV: 12 PS (?) STRAW LAV LKr RICH CHANTI CEDAR MUV CHOD VF GTK ? IRC/SAC

  5. Comparison of TR and final set-up in number of units/channels VF

  6. Our constraint on man-power VF • Currently the central DCS team consist of 5 persons • Jonas Arroyo Garcia (100%) – our main developer • Roman Fedoseev (100%) – developper started to work with us in 2011 • Piotr Golonka (10%) – EN/ICE project leader • Riccardo Fantechi (10%) • ValeriFalaleev (50%) • Contract with Jonas will finish at the end of July. • Situation with Roman is unclear. • To ensure delivery of the system we should work under assumption of the worst case scenario: 10-12 man-months available and termination of main DCS tasks already in 2013.

  7. DCS strategy in 2013 VF • Concentrate on basic control of whole detector without closing possibility of future upgrade (horizontal base) • Test and integration of all available middleware • Integration of all available hardware (in ideal case all experiment hardware should be integrated before August 2013) • Migration to final network and DB set-up • Simplified User Interface and functions • Implement advanced control in case of availability of extra manpower

  8. First steps in 2013 VF • Movement of DCS into new environment: • Migration to new version of SLC6, WinCC OA 3.11 and FW 5.1.0 on one of our server • Migration of KTAG and LAV applications in new environment • The rest of TR system will be moved in February • Successful test of CEDAR NINO control with an ELMB (see CEDAR WG materials) • LAV4-8 HV system arrangement in PC farm area • First LKr CAEN FE crate (again in PC farm)

  9. Message to our dear users CAEN FE crates RICH FE control STRAW HV & LV LAV FE control CHANTI PS KTAG FE control 2013 MPOD LV control HV and LV control FE control FE control FE control: 12 FE control WIENER FE crate CAEN FE crates: 32 WIENER FE crate WIENER FE crates: 5 WIENER FE crates: 4 WIENER FE crates: 12 WIENER FE crate WIENER FE crate CAEN HV CAEN HV CAEN HV CAEN HV: 1,2 CAEN HV: 4 MPOD: 4 CAEN HV: 12 PS (?) • Please take in consideration our limited recourses and goal to deliver a basic DCS for whole detector already in 2013 (in reality everything should be finished before August) • Help us NOW, even if the data taking will start in 2014 • Use supported by EN/ICE hardware to minimize integration efforts STRAW LAV LKr RICH CHANTI CEDAR MUV CHOD