1 / 33

22c:31 Algorithms

22c:31 Algorithms. Minimum-cost Spanning Tree (MST). Minimum-Cost Spanning Tree. weighted connected undirected graph spanning tree cost of spanning tree is sum of edge costs find spanning tree that has minimum cost. 8. 10. 14. 1. 3. 5. 7. 3. 7. 12. 6. 4. 2. 2. 4. 6. 8. 9.

deon
Download Presentation

22c:31 Algorithms

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 22c:31 Algorithms • Minimum-cost Spanning Tree (MST)

  2. Minimum-Cost Spanning Tree weighted connected undirected graph spanning tree cost of spanning tree is sum of edge costs find spanning tree that has minimum cost

  3. 8 10 14 1 3 5 7 3 7 12 6 4 2 2 4 6 8 9 Example • The graph has 10 edges. • Spanning tree has only n - 1 = 7 edges. • Need to either select 7 edges or discard 3.

  4. We are interested in: Finding a tree T that contains all the vertices of a graph G spanning tree and has the least total weight over all such trees minimum-spanning tree(MST)

  5. The Crucial Fact about MST e min-weight “bridge“ edge Crucial Fact

  6. The Crucial Fact about MST The basis of all algorithms Proposition: Let G = (V,E) be a weighted graph, and let V1 and V2 be a partiotion of V (that is, V1 and V2 are two disjoint nonempty subsets and V = V1U V2 ). Furthermore, let e be an edge with minimum weight from among those with one vertex in V1 and the other in V2. There is a minimum spanning tree T that has e as one of its edges.

  7. Justification: If T doesn’t use e but use a to connect V1 and V2, then T’ = T U { e} – { a } is another spanning tree lighter than T. a e min-weight “bridge“ edge Crucial Fact

  8. Edge Selection Greedy Strategies • Start with an n-vertex 0-edge forest. • Consider edges in ascending order of cost. Select edge if it does not form a cycle with already selected edges. • Kruskal’s method. • Start with one vertex (a tree of a single vertex) and grow it into an n-vertex tree by repeatedly adding a vertex and an edge. When there is a choice, add a least cost edge. • Prim’s method.

  9. Edge Rejection Greedy Strategies • Start with the connected graph. Repeatedly find a cycle and eliminate the highest cost edge on this cycle. Stop when no cycles remain. • Consider edges in descending order of cost. Eliminate an edge provided this leaves behind a connected graph.

  10. 1 3 5 7 2 4 6 8 Kruskal’s Method 8 10 14 • Start with a forest that has no edges. 1 3 5 7 7 3 12 6 4 2 2 4 6 8 9 • Consider edges in ascending order of cost. • Edge (1,2) is considered first and added to the forest.

  11. 7 3 6 4 Kruskal’s Method 8 10 14 • Edge (7,8) is considered next and added. 1 3 5 7 1 3 5 7 7 3 12 6 2 4 2 2 4 6 8 2 4 6 8 9 • Edge (3,4) is considered next and added. • Edge (5,6)is considered next and added. • Edge (2,3) is considered next and added. • Edge (1,3)is considered next and rejected because it creates a cycle.

  12. 10 14 7 3 6 4 Kruskal’s Method 8 10 14 • Edge (2,4) is considered next and rejected because it creates a cycle. 1 3 5 7 1 3 5 7 7 3 12 6 2 4 2 2 4 6 8 2 4 6 8 9 • Edge (3,5) is considered next and added. • Edge (3,6) is considered next and rejected. • Edge (5,7)is considered next and added.

  13. 10 14 7 3 6 4 Kruskal’s Method 8 10 14 • n - 1 edges have been selected and no cycle formed. • So we must have a spanning tree. • Cost is 46. • Minimum-cost spanning tree is unique when all edge costs are different. 1 3 5 7 1 3 5 7 7 3 12 6 2 4 2 2 4 6 8 2 4 6 8 9

  14. 10 14 1 3 5 7 7 3 6 4 2 2 4 6 8 Prim’s Method 8 10 14 • Start with any vertex (a 1-vertex tree). 1 3 5 7 7 3 12 6 4 2 2 4 6 8 9 • Get a 2-vertex tree by adding a cheapest edge. • Get a 3-vertex tree by adding a cheapest edge. • Grow the tree one edge at a time until the tree has n - 1 edges (and hence has all n vertices).

  15. Greedy Minimum-Cost Spanning Tree Methods • Can prove that all result in a minimum-cost spanning tree. Let n = |V| and m = |E|. • Kruskal’s uses union-find trees to run in • O(m log m) time (for sorting edges) • Prim’s method: • O(n2) using adjacency matrix. • O((n + m) log n) using adjacency list and a heap.

  16. Pseudocode For Kruskal’s Method Let G = (V, E), n = |V|. Start with an empty set T of edges. while (E is not empty && |T| != n-1) { Let (u,v) be a least-cost edge in E. E = E - {(u,v)}. // delete edge from E if((u,v) does not create a cycle inT) Add edge (u,v) to T. } if ( |T| == n-1) T is a mininum-cost spanning tree. elseG has no spanning tree.

  17. Data Structures For Kruskal’s Method Edge set E. Operations are: Is E empty? Select and remove a least-cost edge. Use a min heap of edges. Initialize. O(m) time. Remove and return m least-cost edges: O(m log m) time We may sort E first and select edges one by one from left to right. O(m log m) time

  18. Data Structures For Kruskal’s Method Set of selected edges T. Operations are: Does T have n - 1 edges? Does the addition of an edge (u, v) to T result in a cycle? Add an edge to T.

  19. Data Structures For Kruskal’s Method Use an array linear list for the edges of T. Does T have n - 1 edges? Check size of linear list. O(1) time. Does the addition of an edge (u, v) to T result in a cycle? Not easy. Add an edge to T. Add at right end of linear list. O(1) time.

  20. 1 3 5 7 7 3 6 4 2 2 4 6 8 Data Structures For Kruskal’s Method • Each component of T is a tree. • When u and v are in the same component, the addition of the edge (u,v) creates a cycle. Does the addition of an edge (u, v) toTresult in a cycle? • When u and v are in the different components, the addition of the edge (u,v) does not create a cycle.

  21. 1 3 5 7 7 3 6 4 2 2 4 6 8 Data Structures For Kruskal’s Method • Each component of T is defined by the vertices in the component. • Represent each component as a set of vertices. • {1, 2, 3, 4}, {5, 6},{7, 8} • Two vertices are in the same component iff they are in the same set of vertices.

  22. 1 3 5 7 7 3 6 4 2 2 4 6 8 Data Structures For Kruskal’s Method • When an edge (u, v) is added to T, the two components that have vertices u and v combine to become a single component. • In our set representation of components, the set that has vertex u and the set that has vertex v are united. • {1, 2, 3, 4} U {5, 6} => {1, 2, 3, 4, 5, 6}

  23. 1 3 5 7 2 4 6 8 • Initially,Tis empty. Data Structures For Kruskal’s Method • Initial sets are: • {1} {2} {3} {4} {5} {6} {7} {8} • Does the addition of an edge (u, v) to T result in a cycle? If not, add edge to T. Each set has a name and let find(x) return the name of the set containing vertex x. s1 = find(u); s2 = find(v); if (s1 != s2) union(s1, s2);

  24. Use FastUnionFind: each of union and find takes practically constant time. • Initialize. • O(n) time. • At most 2m finds and n-1 unions. • Very close to O(n + m). • Min heap operations to get edges in increasing order of cost take O(m log m). • Overall complexity of Kruskal’s method is O(n + m log m). Data Structures For Kruskal’s Method

  25. Prim‘s Algorithm • All vertices are marked as not visited • 2. Any vertex v you like is chosen as starting vertex and • is marked as visited (define a cluster C) • The smallest-weighted edge e = (v,u), which connects • one vertex v inside the cluster C with another vertex u outside • of C, is chosen and is added to the MST and u is added into C. • 4. The process is repeated until a spanning tree is formed

  26. Prim’s MST Algorithm Prim’s algorithm: key[v] := min(key[v], w(u,v)) Dijkstra’s algorithm: key[v] := min(key[v], key[u]+w(u,v))

  27. Prim’s Example

  28. Prim’s Example

  29. Prim’s Algorithm

  30. Prim’s Algorithm

  31. Prim’s Algorithm

  32. Prim’s Algorithm Get spanning tree by connecting nodes with their parents:

  33. Runtime for Prim’s Algorithm O(V) if using a heap O(lgV) if using a heap O(V) O(E) over entire while(Q<>NIL) loop O(lgV) to update if using a heap! The inner loop takes O(E lg V) for the heap update inside the O(E) loop. This is over all executions, so it is not multiplied by O(V) for the while loop (this is included in the O(E) runtime through all edges. The Extract-Min requires O(V lg V) time. O(lg V) for the Extract-Min and O(V) for the while loop. Total runtime is then O(V lg V) + O(E lg V) which is O(E lg V) in a connected graph (a connected graph will always have at least V-1 edges).

More Related