1 / 26

Enterprise

Enterprise. Peg David AIM Technical Program Manager NETPDTC N621 23 APRIL 2013. Overview. Enterprise AIM I/AIM II & CPM eDMZ Transition Authority to Operate (ATO) SSC NOLA Enterprise Data Center Migration SSC NOLA Citrix – Risk Issues Non-NETC Sites/Commands

Download Presentation

Enterprise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Enterprise Peg David AIM Technical Program Manager NETPDTC N621 23 APRIL 2013

  2. Overview • Enterprise AIM I/AIM II & CPM eDMZ Transition • Authority to Operate (ATO) • SSC NOLA Enterprise Data Center Migration • SSC NOLA Citrix – Risk • Issues • Non-NETC Sites/Commands • AIM Content Repository Requirements • Configuration Control Board (CCB)

  3. AIM Central Site Hosting at NETPDTC • NETC N74/N6, NETPDTC & NAWCTSD Migration Plan • 18 FEB – 24 APR - Completed eDMZ Migration • All NETC Learning Centers and SSP • Content, databases, processing, Citrix NTSS Accounts • Benefits • Simultaneous access by geographically dispersed Center and contractor personnel for collaborative development and maintenance • Positions AIM Enterprise for SPAWAR New Orleans (NOLA) Enterprise Data Center Transition (NEDC) • Lessons Learned • RADM Quinn – BZ!

  4. GovernmentCPM Hosting • CPM in Aimereon/vendor site – Sunset 12 APR • CPM in NETPDTC eDMZ deployed – 15 APR • https://cpm.prod.aim.netc.navy.mil • Benefits • Enterprise production hosting and support vs current contractor environment with limited server configuration and bandwidth • Leverages NETC domain Sys Admin, Database Management, and Information Assurance expertise at NETPDTC and SSC NOLA • Co-located with rest of NETC enterprise IT applications; secure access from both .mil and .com domains

  5. AIM ATO Status • 3-year ATO granted by FLTCYBERCOM 26 Dec 12 • Allowed us to proceed with migration of AIM I/II Central Site instances into NMCI eDMZ and hosting CPM in eDMZ vs vendor site • ATO POAM CAT III – deployment of CAC for Application Jun/July timeframe (T) • Certification & Accreditation (C&A) artifacts are routinely kept updated; used for annual FISMA reviews, etc, living documents • Migration to SPAWAR NOLA requires modified ATO to support NEDC environment

  6. AIM Central Site Migration to NOLA NEDC • Goal: Hardware/system software infrastructure in place SSC NOLA by 30 SEP 13 • Schedule for operational transition/deployment from current NETPDTC eDMZ host to NOLA host TBD • Lessons Learned - Transition plan similar to recent eDMZ migration – Application Functional Testing (AFT); Production cutover • Management of AIM I/II/LO Module Central Sites and CPM will remain with NETPDTC; only physical hosting moves to NOLA • NEDC Remote Access: GFE or CFE required for SPAWAR CITRIX access – discussions in progress

  7. Risk ManagementNEDC Remote Access Description: (1) For Off-site Users - GFE or CFE is required for SPAWAR CITRIX access -- Govt Furnished Equipment (GFE) = property acquired directly by Govt and made available to contractor; and, -- Corporate Furnished Equipment (CFE) = equipment purchased by DoD/Govt contracted company specifically in support of DoD/Govt contract; used only by personnel supporting that contract High Low Medium Probability 10 30 50 70 90 Mitigation Plan: -- NETPDTC team provided current AIM Citrix STIG mitigations; architecture to NOLA team -- SPAWAR NOLA team discussed separate AIM APP Citrix instance vs shared Citrix Farm -- Technical options for AIM Users – discussions forthcoming AIM Engineering Mtgs Apr; arrive at consensus 1 2 3 4 5 Impact

  8. Issue:Privilege Levels • 5 levels implemented in Central Site AIM II per CNATT request • 3 levels implemented in Central Site AIM I per SSP request • CPM-style role/privilege structure tasked and funded by NETC N74/NAWCTSD

  9. Issue:Hosting Test Environment • NMCI AIM users needed to test ongoing system enhancements as part of formal Govt Acceptance Testing (GAT) process • Cannot install in-process AIM updates on local NMCI PCs or access contractor-hosted virtual server to conduct tests • NETPDTC to establish Test Environment to support ongoing requirement

  10. Issue:Blocking Word Macros • NMCI does not allow MSWord macros to be enabled on NMCI desktop PCs once Win 7/Office 2010 is installed • This poses crippling limitation on TG functionality for stand-alone desktop installations of AIM under NMCI; no work-around has yet been identified • Does not affect AIM Central site instances inside eDMZ

  11. Issue:Software Release Process • All Central Site instances now migrated to Rel 5.0 • CNATT requirement to maintain local NMCI AIM II instances to support effective community-wide business process • Discussion re NMCI certification process / schedule • Impact of NMCI certification delay / push of Rel 5.0

  12. Issue: NOFORN NNPI • Affects primarily non-SWS undersea community – NAVSEA 07TR, SLC & SLC learning sites • Stringent data handling controls re unclassified No Foreign Dissemination Navy Nuclear Power Information (NNPI), mandated by NAVSEA 08 • NETC/NETPDTC stood up TRANET-C NNPI COI to host: • SLC reference materials, e-library, IETMs, course curriculum info, AIM content, used by SLC/DETs • TRANET-C NNPI COI use/rqmts by other LCs TBD • POC: Bruce Bare, NETC

  13. Non-NETC Commands Implementation • Non-NETC Commands interest in AIM Enterprise • Prioritizing in Process • NSTC (OTC/RTC) – in process • Navy Medicine • NAVSPECWARCEN (hosted by NAVSOC) • NAVRES • DANTES • Regional Maintenance Centers – Norfolk / San Diego • Naval Shipyards - hosted Norfolk

  14. AIM Content Repository • Enterprise Requirements’ for Ancillary Data Storage Area • AIM Enterprise has multiple components: AIM I, AIM II, CPM, LO and ancillary file shares • Requires configuration management; search; access by enterprise users • Notional Plan • Complete Functional Requirements Document • H2 assisting – collate input/requirements provided from LCs • FY14 goal/priority

  15. Configuration Control Board (CCB) • NETC Instruction 5200.3 – established authoritative framework for effective & innovative configuration compliance for IM/IT as it relates to NETC WD Line of Business -- Each T&E App has Charter; Chairpersons: PM and TPMs • Purpose of CCB: ensure programmatic changes (i.e., consideration of proposed cost and schedule changes) and related technical changes to information systems are processed in a visible and traceable manner • AIM CCB membership – commands/vendors (as applicable): • NETC N74 Program Manager (PM) – Michael Mosley • NETC N741A Deputy Program Manager (DPM) – Leslie Desenburg • NETPDTC N621 Technical Program Manager (TPM) – Peg David • NETPDTC Information Assurance (IAM/IAO) – Kelley Harris or designated IAO • NETPDTC System Development Team – Christopher Stark; when applicable • NAWCTSD Application Technical Program Manager (TPM) – Tiffany Dombrowski • NAWCTSD System Dev/Trng Team – Mike Matzko / Mike Coyle • AIMEREON Application Team – Jim Ferrall and AIMEREON staff as identified; when applicable • NETC Learning Centers – Representatives as identified via the AIM FRB; when applicable • SSP and other Navy Commands Using Enterprise AIM – Representatives as identified via the AIM FRB – when applicable

  16. CCB (cont) • CCB Forum • Participants get together discuss (specified work/projects) which need to be completed • Responsible agents are assigned for performing agreed-upon work • Decisions/assigned actions are recorded when completed • Includes: providing tech support during development of decision support documentation such as: Requests for Information Services (RIS), System Functionality Assessments (SFA), Analysis of Alternatives (AOA), Independent Cost Estimates (ICE), and Software Change Requests (SCR), etc. • CCB shall review, adjudicate, elevate, or place on hold proposed changes for adjudication as required • CCB shall reach a decision after a period of presentation and discussion, at which time the Chairperson may poll members for their position or recommendation • CCB Chairperson(s) shall make all final decisions • Held ICW AIM FRB Meetings; or on more frequent basis; when applicable

  17. AIM Central Site Implementation • Points of contact: • NETC N74: Mike Mosley, Leslie Desenburg • NETPDTC: Peg David, Christopher Stark • NAWCTSD: Tiffany Dombrowski, Mike Matzko • AIMEREON: Jim Ferrall, Steve Wicinski, Mike Coyle • NETPDTC Enterprise/Central Site specifics, narrated help videos, lessons learned - available on AIM information Web page: • http://aim.aimereon.com/aim/AIM-Central-Site-Hosting-at-NETPDTC.ashx

  18. Questions?

  19. Enterprise Training Management FrameworkContinuous Process ImprovementETMF Status UpdateBruce Bare, NETC N62Jon Sullivan, H2 Performance Consulting, Corp 23 April 2013

  20. Topics • ETMF Phase II Goals & Deliverables • Roadmap Results to Date • Current Roadmapping Activities • Roadmap Development Schedule

  21. ETMF – Phase II Goals • Document and analyze “As-Is” state of core business processes required to develop, manage and deliver training curricula • Identify duplication, inefficiencies, process improvement opportunities • Determine most efficient alignment of core training management systems • Recommend strategies that will support NETC’s ability to continue quality & quantity of education while controlling (reducing) costs Deliverables Inventory Management Process Recommendation – Delivered Mar 2013 Assessments Tool Recommendation – Planned Jun 2013 Delivery NETC Enterprise Technology Roadmap – Planned Sep 2013 Delivery

  22. Roadmap Results To-Date Business / Service Workshops: COMPLETED Technology Workshops: COMPLETED • Participating Teams • NETC N72, N73, N74 • CPPD • CNATT • CID • LAS Team • NETPDTC N612 • NETPDTC N621 *Data not represented • Sample Data Pool • 53 Participants • 328 Responses

  23. Roadmap Responses to Date Gap Areas by Category Number of Responses

  24. Current Roadmapping Activities • Data Gathering • Remaining Technical Workshop Input • Data Validation • Workshop & Focus Group Data Analysis • Findings Validation Survey Analysis • Gap Analysis • Results Documentation • Roadmap Initiative Groupings • Roadmap Initiative Worksheets • Charting Workshop Planning • Customizing Roadmap Templates • Identifying Industry Trends

  25. Roadmap Development Schedule Progress as of 23 April 2013 Feb March April May June July August September Workshop 3 Technology Workshops 1 & 2 Workshop 4 Charting Final Deliverable ConstraintReview Draft Review Documentation & Validation Documentation & Validation Documentation, Validation & Analysis Validation & Draft Prep Charting

  26. Questions?

More Related