ITEP LCG infrastructure. NEC’2009, Varna, Bulgaria Ivan Korolko (ITEP Moscow). LCG activities in ITEP. SA1 activities - EGEE3 project (E.Lyublev) User Support (V.Kirichenko) ITEP supports all LHC experiments very good connectivity with CERN based experts Popularization of GRID in ITEP:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ITEP LCG infrastructure' - denali


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Itep lcg infrastructure

ITEP LCG infrastructure

NEC’2009, Varna, Bulgaria

Ivan Korolko (ITEP Moscow)


LCG activities in ITEP

  • SA1 activities - EGEE3 project (E.Lyublev)

  • User Support (V.Kirichenko)

  • ITEP supports all LHC experiments

    very good connectivity with CERN based experts

  • Popularization of GRID in ITEP:

    PHOTON (SELEX experiment)

    Lattice (M.Polykarpov)

    FAIR facility (Y.Zaitsev)






Infrastructure
Infrastructure

  • In operation since 2004

  • CPU (605 KSI2k) :

    • 30WNs (P4-HT, 2.4 GHz, 2GB)

    • 20 WNs (2xdual-core 2.5 GHz, 8GB)

    • 16 WNs (2xquad-core 2.7 GHz, 16 GB)

  • SE – 150 TB dCashe pools

    (1-3 TB, 12x10 TB, 1x20 TB)

  • SL 4.7 (32bits) + SL5.3 (64bits)

  • SE connectivity – 2x1 Gb/s (rather low…)




Internet connectivity (~80% for LCG)

In 2009 we plan to install new CISCO – 10 Gb


ITEP computing centre

  • Reserve power line

  • New cooling system

  • Good connectivity (plan to improve)

  • Free space for further developments

  • Enthusiastic support team

Waiting for first LHC data…