An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Approaches to Historic Bridge RehabilitationCase Study #3 Carrollton Bridge Jonathon L. Sera, P.E.

  2. Case Study #3 Carrollton Bridge • Carrollton Road over the Wabash River, just north of Delphi, Indiana • Rural location was the site of the first permanent crossing of Wabash River. Also, the location of historic Wabash and Erie Canal Lock. • Reinforced Concrete Arch Bridge • Constructed in 1927 • Six spans • Designed by Daniel B. Luten • Listed on the National Register of Historic Places

  3. Case Study #3 Carrollton Bridge Rehabilitation • Notice to Proceed with Design: May 2nd, 2005 • Construction Cost: $1,916,750 • Designer: Butler, Fairman, & Seufert, Inc. • Owner: Carroll County • Contractor: Wirtz and Yates, of Kentland, Indiana

  4. Significant Issues Associated With Project Case Study #3 • 20 foot wide clear roadway • Deteriorated original railing

  5. Case Study #3 Extensive Concrete Deterioration in Overhang Brackets

  6. Case Study #3 How Clearance Issue Was Resolved • Bridge owner wanted to widen bridge by 8 feet. • Interested historical agencies wanted width to remain the same. • Both parties compromised on widening bridge by 4 feet.

  7. Case Study #3 How Railing Issue Was Resolved • Modified Texas Rail to match existing rail. • Changed the opening shape from the “church window” to a rectangle. • We were able to keep reinforcement details the same. Therefore, the rail was stillconsidered crash-worthy.

  8. Case Study #3 New longer brackets were designed composite with deck.

  9. Case Study #3 Old Brackets were used as temporary supports and as guides for new brackets.

  10. Case Study #3 How Aesthetic Issue Was Resolved Insert Picture(s) of Solution • Masonry Coating was used to blend new concrete with old. • Contract required several test swaths. • Owner agreed to allow interested parties to select final color combinations.

  11. Case Study #3 Project was reopened to traffic 19 months after notice to proceed for design work.

  12. The rehabilitation cost approximately 40% less than the earlier planned replacement. Case Study #3

  13. Lessons Learned/Conclusions Case Study #3 • Must encourage owner and interested parties to compromise. • Look for current standards that may be able to be slightly modified to match existing conditions. • Careful detailing can ensure that historic integrity is not lost in rehabilitation and repair work.