US ITER Diagnostics. David Johnson Diagnostics Team Leader. November 15, 2006 US ITER Project Vendor Fair Oak Ridge, TN. Outline. US Scope Port Plugs Instruments Schedule. US Diagnostic Packages. Design maturity is conceptual. Scope - US Port Plugs. Upper Plugs (U5, U17)

debra
Download Presentation

US ITER Diagnostics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US ITER Diagnostics David Johnson Diagnostics Team Leader November 15, 2006 US ITER Project Vendor Fair Oak Ridge, TN

  2. Outline US Scope Port Plugs Instruments Schedule

  3. US Diagnostic Packages Design maturity is conceptual.

  4. Scope - US Port Plugs Upper Plugs (U5, U17) (4.5m long, ~25T in-vessel) Equatorial Plugs (E3, E9) (2.2m high, ~50T in-vessel) • Plugs provide • Vacuum seal, radiation shielding • Cooling water and support for blanket shield modules • Support and access for diagnostics • Plugs consist of • Generic structural components common to all of that type • Custom diagnostic shield modules Divertor Side Panels and Back Boxes (L8)

  5. Upper Visible/IR Cameras (6 in upper ports)

  6. Main Plasma Reflectometer (LFS) Differential movements taken up in waveguide joints

  7. Electron Cyclotron Emission Diagnostic

  8. Motional Stark Effect Polarimeter Plan view of edge MSE sightlines Port E3 Heating Beam

  9. Toroidal Interferometer/Polarimeter

  10. Divertor Interferometer

  11. Residual Gas Analyzers Pumping duct (1 of 4)

  12. Schedule/Responsibilities • A prerequisite for major diagnostic design effort is the renegotiation of the PP’s to resolve existing scope ambiguities and clarify stakeholder roles/responsibilities and permitting detailed design to begin. • In the present plan, most procurements would be made during the fabrication phase from FY10 - FY12. • As partner lab responsible for diagnostics, PPPL will subcontract with other experienced institutions to provide the instruments. • PPPL will design the port plugs, will integrate the ‘front-ends’ from multiple systems, and will oversee the fabrication, assembly and testing of the plugs.