An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SA1: technical progress Arpad Szomoru JIVE

  2. e-VLBI: operational improvements • Overall improvement in first 16 months: • Robustness • Reliability • Speed • Ease of operation • Station feedback • Minimizing data loss by careful scheduling • Increase of production data rate from 128 Mbps to 256 Mbps • 6-station fringes at 512 mbps • Inclusion of Metsähovi and Medicina telescopes Arpad Szomoru, eVSAG, Gothenburg

  3. e-VLBI: data rate improvements Arpad Szomoru, eVSAG, Gothenburg

  4. Operational e-VLBI: latest results Arpad Szomoru, eVSAG, Gothenburg

  5. The EVN MarkIV correlator Custom-made hardware, ~500000 lines of C++ code Designed and built on tape technology, only recently adapted for disk-based recording Arpad Szomoru, eVSAG, Gothenburg

  6. Work packages • Standard e-VLBI correlator mode: • Wall-clock time vs ROT • Centralized control • Rapid response/ToO functionality: • Real-time monitoring/feedback/analysis • On-the-fly adjustment of observational/correlator parameters • Improved amplitude calibration • Data transport issues • Lightpaths: guaranteed (high) bandwidth • Transport protocols (modified TCP, UDP-based, VSI-e…) • Hardware issues • New control computers (reliability, speed) • Replacement of SUs (cause of much misery) • Networking hardware (router, interfaces) Arpad Szomoru, eVSAG, Gothenburg

  7. e-VLBI correlator mode: control interfaces Arpad Szomoru, eVSAG, Gothenburg

  8. Monitoring tools: Integrating fringe display Arpad Szomoru, eVSAG, Gothenburg

  9. Monitoring tools: Data status monitor Arpad Szomoru, eVSAG, Gothenburg

  10. Monitoring tools: Data status monitor Arpad Szomoru, eVSAG, Gothenburg

  11. Rapid adjustment of correlator params: vex editor Arpad Szomoru, eVSAG, Gothenburg

  12. (near) Real-time analysis: streamlining of post processing Arpad Szomoru, eVSAG, Gothenburg

  13. Web-based Post-processing Arpad Szomoru, eVSAG, Gothenburg

  14. Hardware New control computers • Solaris AMD servers, redundant power supplies • Interchangeable for maximum reliability • Cut down dramatically on (re-)start time • Removal of single points of failure Mark5 upgrade • Original Mark5s woefully under-powered (Pentium PIII…) New dual processor motherboards, memory, power supplies • Mark5A→B: new streamstor cards, new serial links (optical and coax), Correlator Interface Boards • Elimination of Station Units, VSI compliance Arpad Szomoru, eVSAG, Gothenburg

  15. Upgrade of network at JIVE Arpad Szomoru, eVSAG, Gothenburg

  16. Arpad Szomoru, eVSAG, Gothenburg

  17. SA1: the next 18 months All personnel in place, at JIVE and JBO Main focus: • Adaptive scheduling • Increasing the operational data rate • Improving flexibility and robustness of correlation • New telescopes • Inclusion of eMERLIN telescopes • Re-assessment/refinement of deliverables Arpad Szomoru, eVSAG, Gothenburg

  18. Specific tasks Crucial: • fast/adaptive (re-)scheduling • Transform EVN into a truly flexible instrument • Reaction time of hours • Remote control of widely different telescope control systems • Safeguard local operational constraints • hard/software upgrade • Phase out aging Station Units, cause of much misery • Involves large software effort • VSI compliance Arpad Szomoru, eVSAG, Gothenburg

  19. Fine-tuning of deliverables • Use of WSRT synthesis data for e-VLBI calibration (absolute flux calibration, polarization calibration, source selection) • Space craft tracking correlator mode • On-the-fly fringe fitting • Real-time download and extraction of station information • Automated correlator diagnostics • Removing/adding stations from the correlation process on the fly • Investigating a 1024M sub-array Arpad Szomoru, eVSAG, Gothenburg

  20. Connectivity improvements: • Use of new/modified transport protocols, lightpaths across Europe • Increase granularity of data streams to optimize utilization of available bandwidth • Increase of sensitivity and resolution through addition of telescopes: Effelsberg, Yebes, Shanghai • Improving global connectivity: South-America, Puerto Rico, China, Australia Arpad Szomoru, eVSAG, Gothenburg

  21. Global connectivity: • Arecibo: 64 Mbps real-time operations in the past, currently < 32 Mbps. New submarine cable facilities in near future… • Australia: 4 LBA telescopes connected at 1 Gbps. Lightpath to Europe via Canada will be available next Monday. Issues with format conversion (VSI-Mark5B-Mark5A+), command interfaces, long haul transport • First tests (not via lightpath): interface seems to work, format conversion unclear as yet, but yellow leds at 64 Mbps (from three telescopes) Arpad Szomoru, eVSAG, Gothenburg

  22. ORIENT: 2.5 G TEIN2: 622 M 1G 100M 155 M 2.5G 34 M 2.5G 50 M 1G 622 M 1G HKOEP e-VLBI to China SURFnet Arpad Szomoru, eVSAG, Gothenburg

  23. e-VLBI to China (2) • Lightpath Sheshan (near Shanghai) – JIVE in place (via HongKong, Chicago). RTT 360 ms. • Test results (iperf) • 930 Mbps Seshan – Hong Kong (!!) • 400 Mbps Hong Kong – JIVE • ~100 Mbps Seshan – JIVE • But… issues with security machines, shared bandwidth, reservation of timeslots needed • New lightpath via Siberia available since last Monday Arpad Szomoru, eVSAG, Gothenburg

  24. e-VLBI to China (3) • First operational results: impossible to reach 32 Mbps • Old Linux kernel, TCP Reno, lossy connection, very long RTT Arpad Szomoru, eVSAG, Gothenburg

  25. Next big issue • Long haul transport *not* via lightpath: need either modified TCP or UDP based protocol • New streamstor libraries will be available real soon now: disable congestion control • Mark5A code has been fiddled to work with plain UDP again • Collaboration with Manchester to fold VLBI_UDP into Mark5A code is ongoing • Will have to work before APAN meeting demo… Arpad Szomoru, eVSAG, Gothenburg