1 / 7

Interpreting a seismic line

CMP. 500. 1000. TWT (ms). 1500. 2000. Interpreting a seismic line. Step 1: Initially we need to identify a horizon. On this line it is specified at CMP 1001 indicated by the arrow. . CMP. 500. 1000. TWT (ms). 1500. 2000. Interpreting a seismic line.

darrion
Download Presentation

Interpreting a seismic line

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 1: Initially we need to identify a horizon. On this line it is specified at CMP 1001 indicated by the arrow.

  2. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 2: The horizon is a white trough and occurs at 650 ms, marked by the second arrow.

  3. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 3: To make it easy to see, the horizon must be marked with its own colour, which in this case is yellow.

  4. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 4: Next the horizon is followed across the whole section, leaving gaps if there are jumps or breaks in the horizon.

  5. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 5: The course of any faults down through the section are then marked.

  6. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 6: The faults type is then identified, marking the downthrow side with arrows. Both the red and blue faults are normal, with the downthrow to the high CMP end.

  7. CMP 500 1000 TWT (ms) 1500 2000 Interpreting a seismic line Step 7: Both faults have a throw of around 50 ms, marked with the green line.

More Related