1 / 6

Agenda

Agenda. Safety Schedule Machine and system reports. Safety and training. Safety: Ed Lessard . Schedule.

darby
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda • Safety • Schedule • Machine and system reports A. Fedotov, Time Meeting

  2. Safety and training • Safety: Ed Lessard A. Fedotov, Time Meeting

  3. Schedule • Wednesday, April 6 – Down-ramp Machine Development (up to 16 hours). The goal is to understand how much polarization is lost between 100 and 250 GeV. This study is needed for future projection of polarization at 250GeV. • Physics stores for the rest of the week • Friday, April 8 (possibly additional 8 hours of MD to complete down-ramp studies, TBD/confirmed on April 7). Set-up for Au-Au 18GeV (1+1 week) run: • Set-up of injectors in progress – could be ready to switch for set-up in RHIC April 8-9. Will need few days for set-up in RHIC. • April 8- Will need decision when to stop pp Run and switch to Au-Au set-up in RHIC to prepare for 1 week physics run at 18GeV. Do we run pp through the weekend (till April 11-12)? Till the end of next week (April 15)? Switch to Au on April 9? A. Fedotov, Time Meeting

  4. Machine and system reports • RHIC Run-11 pp 500GeV Haixin Huang • STAR Xin Dong • PHENIX Takao Sakaguchi • AnDY Les Bland A. Fedotov, Time Meeting

  5. Machine and system reports • BLIP Leonard Mausner • Operations Peter Ingrassia • Preparation for Au-Au run Greg Marr • Jet • Polarimeter • RF/9MHz • Linac/EBIS • RCF M. Ernst: “Services are working according to the expected level”. A. Fedotov, Time Meeting

  6. Next Time meeting • Next Time meeting: April 12 A. Fedotov, Time Meeting

More Related