FY11 Infrastructure Roadmap Update. Enterprise Services (Supporting Activities). NetCentric Demos/Prototypes TIM. Mike Hritz. 3 November 2010. NAS Services Functionality Description – SV-4b. Enterprise Services Roadmap (1 of 7). CY. 2009. 2010. 2011. 2012. 2013. 2014. 2015. 2016.

Download Presentation

FY11 Infrastructure Roadmap Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Fy11 infrastructure roadmap update

FY11 Infrastructure Roadmap Update

Enterprise Services

(Supporting Activities)

NetCentric Demos/Prototypes TIM

Mike Hritz

3 November 2010


Nas services functionality description sv 4b

NAS Services Functionality Description – SV-4b


Fy11 infrastructure roadmap update

Enterprise Services Roadmap (1 of 7)

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

SWIM Segmt. 3

SWIM Segmt.1

SWIM Segmt. 2

Enterprise

Governance

SWIM Segment 1

Design-Time Registry

SWIM Segment 2

Enterprise Metadata Repository

COI/Governance

Processes/Procedures

Identity &

Key Management

(IK&M)

SWIM Segment 3

Enterprise Governance

Internal Policy

Enforcement (IPE)

588

293

IID

297

Administrative

Services

Intrusion Detection &

Response (ID&R)

NEISS

SWIM Segment 3

Administrative Services

FID

295

Certified Software

Management (CSM)

for COTS Software

WIKI-based Information

Access Capability

E02

E01

COI/Governance

Processes/Procedures

Interaction

Services

TBFM/IES

FID57

SWIM Segment 3

Interaction Services

En Route Automation

NextGen Mid-Term WP

En Route Automation

NextGen Far-Term WP

TFDM 2

FID346

IID356

IARD355

CATMT WP4


Fy11 infrastructure roadmap update

Enterprise Services Roadmap (2 of 7)

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

SWIM Segmt. 3

SWIM Segmt.1

SWIM Segmt. 2

Support

Services

NextGen Reduced

Weather Impact -- NNEW

IID

451

IARD

450

IARD

79

IID

86

FID

89

NNEW WP1

NNEW

WP2

FID

635

TR NextGen

4-D

Weather SAS

X

AIMModernizationSegment 2

AIM ModernizationSegment 1

FID121

FID2

FID122

417

AIMModernization Segment 3

IARD405

SIM

FID102

IID406

SOA Core

Services

FID128

FID277

FIDES5

130

Enterprise Enhanced Wide Area Network Services

SWIM

SERVICE CONTAINER

Enterprise Surveillance

Broadcast Services

SWIM Segment 2

Enterprise Messaging Bus

Collaboration Tools

Service Management Tools

Design-Time Registry

Metadata Repository

SWIM Segment 3

Enterprise SOA

IID

297

585

Intrusion Detection &

Response (ID&R)

NEISS

FID

295

IARD

294

588

293

Internal Policy

Enforcement (IPE)–

NEISS

522

Identity &

Key Management

(IK&M)


Fy11 infrastructure roadmap update

Enterprise Services Roadmap (3 of 7)

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

CRDR217

CRDRES1

IARD496

IARDES2

IIDES3

IID497

FIDES4

FID498

SWIM Segmt. 3

SWIM Segmt.1

SWIM Segmt. 2

Technical

Infrastructure

Services

345

Enterprise Level Time & Frequency Solution

38

Enterprise

Wide Area

Network Services

Enterprise Enhanced Wide Area Network Services

FID74

NADIN MSN

FTI-2

NEXCOM Segments 1 and 2

FID350

FID499

FID353

FID158

FID304

DATACOMM Segments 1, 2,3

AeroMACS

Note: Fixed User Ground Communications as a component of a Mobile User Communications Network

IARD405

IID

77

FID

104

IID406

FID102

IARD

407

NextGen Surveillance and Weather Radar Capability

SIM

IID78

FID105

NextGen backup Surveillance Capability

SBAS (WAAS) L5

Internal Policy

Enforcement (IPE)

588

IID

297

585

Intrusion Detection &

Response (IDR)

FID

295

External Boundary

Protection (EBP)

589

Identity &

Key Management

(IKM)

522

Certified Software

Management (CSM)

-for COTS Software

586


Fy11 infrastructure roadmap update

Enterprise Services Roadmap (4 of 7)

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

SWIM Segmt. 3

SWIM Segmt.1

SWIM Segmt. 2

Enterprise Mission Services

FID31

Post ERAM R3

Work Package

ERAM Program

Baseline

En Route Automation

NextGen Mid-Term WP

En Route Automation

NextGen Far-Term WP

FID102

FID440

IID45

FID107

FID102

TAMR Phase 3

FID46

TFDM 2

TFDM 1

FID195

FID57

TBFM

TBFM/IES

CATMT WP1

FID346

IID356

CRD354

IARD355

CATMT WP4

CATMTWP3

FID125

AFSM

Meteorological and Aeronautical Planning System (MAPS)

FID208

IID368

IARD

79

IID

86

FID

89

NextGen WxProcessor (WP1)

NextGen Wx

Processor (WP2)

NextGen Wx

Processor (WP3)

ISD 454

FID 143

IARD 452

IID 453

NextGen Reduced Weather Impact (RWI) Solution Set

ASIAS Phase 1

ASIAS Phase 2

FID206

IID177

IARD33

Security Integrated Tool Set – Work Package

RMLS/SWIM Interface

RMLS NextGen Mid-Term

Work Package

373

376

RMLS NextGen Far-Term

Work Package


10 roadmap activities focus areas

‘10 Roadmap Activities / Focus Areas

  • Improve Integration and Alignment of Supporting Activities

    • ATD&P resources will assist you

    • Try to make sure each activity has a DP at the end of it in the green area

    • RSA Framework

  • AMS Milestones

    • Make sure all AMS milestones are captured on the roadmaps

    • Some cases milestones are missing

    • If tailored out, or projected to be tailored out, that is OK

  • Refine Sub-Capabilities Roadmaps

    • Assists requirements definition POCs with their work

    • Bridges gap between OIs and investments

    • Helps other activities (i.e., FIA work, convergence task, etc.)

    • Will be merged with the enablers in the NAS EA portal (OIs, SubCapabilities, Projects)

  • Solicit feedback from the Sol Set Mgrs – i.e., identify conflicts with the NSIP, misalignment with the Mar ‘10 NGIP, etc.

    • As you update your roadmaps, look to the sol set mgrs for alignment with their plans


Fy11 infrastructure roadmap update

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Enterprise Services Roadmap (5 of 7)

SWIM Sgmt.1

SWIM Sgmt. 3

SWIM Sgmt. 2

Supporting Activities

Governance

COI/Governance

Processes/Procedures

E01

WIKI-based Information

Access Capability

E02

Supporting

Activities

Administrative

Mobile Object

Capability

Evaluation

Supporting Activities

Technical Infrastructure

344

345

Assess Timing and Frequency Architecture

Develop Enterprise Timing and Frequency Strategy

CRDR217

Airport Surface Wireless Prototype (AEROMACS)

Supporting Activities

Mission Services

ITWS SWIM Prototype

IARD

Wx J

IARD

79

CIWS SWIM Prototype

Flight Data Object DEMO

Oceanic Tactical Trajectory Management ((OCAT)

Air Force GIG/

SWIM Prototype


Fy11 infrastructure roadmap update

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Enterprise Services Roadmap (6 of 7)

SWIM Sgmt.1

SWIM Sgmt. 3

SWIM Sgmt. 2

Supporting Activities

Support Services

IARD

438

IID439

FID440

FDIM (Flight Object/SOA)

IARD

144

Wx in Cockpit

Interoperability of Wx data exchange using pub/ sub/ metadata

4D Wx Cube data exchange w/NNEW enabled systems

209

4-D Wx Cube

Demo/Prototype

4-D Wx SAS Algorithms

Supporting Activities

Net-Centric/SOA Concepts

Network Enabled Operations

(Spiral 1)

Network Enabled Operations

(Spiral 2)

Aircraft Access to SWIM

FAA Eurocontrol AP4

FAA SJU SWIM Harmonization

FAA/Europe SWIM Connection

Air Force GIG/SWIM Prototype

International Air Traffic Interoperability (IATI)


Fy11 infrastructure roadmap update

CY

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

Enterprise Services Roadmap (7 of 7)

SWIM Sgmt.1

SWIM Sgmt. 3

SWIM Sgmt. 2

Supporting Activities

Interaction Services

Decision for common Terminal and En Route

R-side display (e.g., hardware and software)

Decision for common display

(e.g., H/W and S/W platforms) of electronic flight data for En Route and Terminal automation

Supporting Activities

SOA Core Services

FIDES5

ED-X Enhanced Data Services (SWIM)

FIDES5

SWIM Enterprise Service Bus Prototype


Questions

Questions?