Possible 3pp2 changes
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

Possible 3PP2 Changes PowerPoint PPT Presentation

  • Uploaded on
  • Presentation posted in: General

Possible 3PP2 Changes. Ed Tiedemann Chair , 3GPP2 TSG-C [email protected] 6 August 2012. Possible Restructuring of TSGs. The 3GPP2 leadership has been exploring the restructuring of the TSGs. Want to broaden the discussion with entire community to collect feedback and identify issues.

Download Presentation

Possible 3PP2 Changes

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript

Possible 3pp2 changes

Possible 3PP2 Changes

Ed Tiedemann

Chair, 3GPP2 TSG-C

[email protected]

6 August 2012

Possible restructuring of tsgs

Possible Restructuring of TSGs

The 3GPP2 leadership has been exploring the restructuring of the TSGs

  • Want to broaden the discussion with entire community to collect feedback and identify issues

  • Leadership elections in December; thus, if changes are to be made, would be logical time

  • Any decision would likely be at the October SC meeting in Sapporo

Possible restructuring of tsgs1

Possible Restructuring of TSGs

The objectives are:

  • Ensure 3GPP2 continues to support the development of technical specifications for the cdma2000 community in a more effective manner.

  • Optimize the meetings by leveraging the synergies in the work between TSG-A and TSG-C, and between TSG-S and TSG-X

  • Realize possible cost savings in terms of actual meeting requirements (number of rooms, secretarial support, etc.)

Existing tsg c organization

Existing TSG-C Organization

Existing tsg a organization

Existing TSG-A Organization

Merged organization

Merged Organization


Femto IOS


Program Management



Merger aspects

Merger Aspects

  • TSG-A Program Management aspects (TSG-A WG1) would merge into TSG-C WG1

  • TSG-A Femto IOS (TSG-A WG2) and TSG-A CDMA IOS (TSG-A WG3) would merge into WG5

  • There could be additional restructuring in legacy TSG-C aspects if they resulted in additional improvements

  • Currently should determine whether any serious problems

    • May require some thinking though how a merged TSG-A and TSG-C would operate and identify any issues

    • SC meeting in October would make decision on whether to merge

    • Any decisions on how a merged TSG A and C would actually work can be done after the agreement on the merging. These would be internal to the merged TSG.

Merger aspects continued

Merger Aspects (continued)

  • Documents would maintain C.x or A.x nomenclature

  • Any new document that is created would use a C.x or an A.x format, depending upon which is appropriate

  • It is expected that WG5 would need about 12 hours/week

  • To keep costs down, trying to fit into a total of six meeting rooms for all TSGs during f2f meetings

    • TSG-C would get three rooms plus perhaps some of a 4th room (maybe needed when SWG4.2 meets)

  • Login