AGATA: Advanced Gamma Tracking Array

AGATA: Advanced Gamma Tracking Array. AGATA WEEK SUMMARY and STATUS. MANY APOLOGIES John Simpson Nuclear Physics Group Daresbury Laboratory. Presented by:. AGATA The A dvanced Ga mma Ray T racking A rray. Introduction: The AGATA project

dante-hicks
Download Presentation

AGATA: Advanced Gamma Tracking Array

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGATA: Advanced Gamma Tracking Array AGATA WEEK SUMMARY and STATUS MANY APOLOGIES John Simpson Nuclear Physics Group Daresbury Laboratory Presented by:

  2. AGATAThe Advanced Gamma Ray Tracking Array • Introduction: The AGATA project • Current status of the AGATA; towards the “demonstrator” • Exploitation of AGATA; demonstrator and beyond Next generation g-ray spectrometer based on gamma-ray tracking 4 germanium array  no Compton suppression shields Versatile spectrometer with very high efficiency and excellent spectrum quality for radioactive and high intensity stable beams

  3. AGATA(Design and characteristics) 4-array for Nuclear Physics Experiments at European accelerators providing radioactive and stable beams Main features of AGATA Efficiency: 43% (M=1) 28% (M =30) today’s arrays ~10% (gain ~4) 5% (gain ~1000) Peak/Total: 58% (M=1) 49% (M=30) today ~55% 40% Angular Resolution:~1º  FWHM (1 MeV, v/c=50%) ~ 6 keV !!! today ~40 keV Rates: 3 MHz (M=1) 300 kHz (M=30) today 1 MHz 20 kHz • 180 large volume 36-fold segmented Ge crystals in 60 triple-clusters • Digital electronics and sophisticated Pulse Shape Analysis algorithms allow • Operation of Ge detectors in position sensitive mode  -ray tracking

  4. The AGATA CollaborationMemorandum of Understanding 2003-07 Research and Development phase Bulgaria: Univ. Sofia Denmark: NBI Copenhagen Finland: Univ. Jyväskylä France: GANIL Caen, IPN Lyon, CSNSM Orsay, IPN Orsay, CEA-DSM-DAPNIA Saclay, IreS Strasbourg Germany: GSI Darmstadt, TU Darmstadt, Univ. zu Köln, LMU München, TU München Hungary: Debrecen Italy: INFN and Univ. Firenze, INFN and Univ. Genova, INFN Legnaro, INFN and Univ. Napoli, INFN and Univ. Padova, INFN and Univ. Milano, INFN Perugia and Univ. Camerino Poland: IFJ PAN Krakow, SINS Swierk, HIL & IEP Warsaw Romania: NIPNE & PU Bucharest Sweden: Chalmers Univ. of Technology Göteborg, Lund Univ., Royal Institute of Technology Stockholm, Uppsala Univ. UK: Univ. Brighton, STFC Daresbury, Univ. Edinburgh, Univ. Liverpool, Univ. Manchester, Univ. Paisley, Univ. Surrey, Univ. York Turkey: Univ. of Ankara, Istanbul University

  5. Ancillary detectors and integration A.Gadea Detector module P.Reiter Simulation and Data Analysis J.Nyberg Front-end Processing D.Bazzacco Data Acquisition Ch. Theisen Design and Infrastructure G. Duchêne Detector and Cryostat B Bruyneel Digitisation P.Medina Data acquisition X.Grave Mechanical design J.Strachan Elec. and DAQ integration P. Bednarczyk Gamma-ray Tracking A.Lopez-Martens AGATA Teams Preamplifiers A.Pullia Pre-processing I.Lazarus Run Control & GUI G.Maron Infrastructure P.Jones Devices for key Experiments N.Redon Physics & exp. simulation E.Farnea R & D on gamma Detectors D.Curien Impact on performance M.Palacz Detector data base K.Hauschild Global clock and Trigger M.Bellato Detector Characterisation A.Boston PSA R.Gernhaeuser/ P.Desesquelles Mechanical Integration J. Valiente Dobon Data analysis O.Stezowski The AGATA Organisation(Many thanks to everybody) AGATA Steering Committee Chairperson: W.Korten (and EURONS)Vice Chairperson: P.J. Nolan G.deAngelis, A.Atac, F. Azaiez, D.Balabanski, D.Bucurescu, B.Cederwall, J. Gerl, J.Jolie, R.Julin, W.Meczynski,, M.Pignanelli, G.Sletten, P.M.Walker AGATA Management Board J.Simpson (Project Manager) D.Bazzacco, G.Duchêne, P. Reiter, A.Gadea, J.Nyberg, Ch. Theisen AGATA Working Groups

  6. The First Step:The AGATA DemonstratorObjective of the final R&D phase 2003-2008 1 symmetric triple-cluster 5 asymmetric triple-clusters 36-fold segmented crystals 540 segments 555 digital-channels Eff. 3 – 8 % @ Mg = 1 Eff. 2 – 4 % @ Mg = 30 Full EDAQwith on line PSA and g-ray tracking In beam Commissioning Technical proposal for full array Cost ~ 6 M € Capital

  7. AGATA Detectors • Symmetric detectors • 3 delivered • Asymmetric detectors • 17 ordered (6 accepted, 4 in test, 7 in 2007/8) • Preamplifiers available • Core (Cologne); Segment (Ganil & Milano) • Test cryostats for characterisation • 5 delivered • Triple cryostats • 4 (soon 5) ordered • 1st being assembled November 2007 Hexaconical Ge crystals 90 mm long 80 mm max diameter 36 segments Al encapsulation 0.6 mm spacing 0.8 mm thickness 37 vacuum feedthroughs

  8. AGATA triple-detector module First prototype summer 2005 3 encapsulated Ge crystals in one cryostat 111 preamplifiers with cold FET ~230 vacuum feedthroughs LN2 dewar, 3 litre, cooling power ~8 watts

  9. AGATA triple-detector module Plans for 2007: First asymmetrictriple module being assembled now Source and possibly in-beam tests using “standard” digital electronics

  10. AGATA Design and Construction 180 geometry defined Conceptual design of 180 array done Specifications of infrastructure parts done Design of AGATA demonstrator for LNL final stages Flanges manufacture started Assembly in LNL, 2007

  11. Characteristation and Scanning Comparison of real and calculated pulse shapes. Validate codes. Coincidence scan for 3D position determination Two symmetric capsules scanned in Liverpool Commissioning of further scanning systems at Orsay and GSI Scan of an asymmetric capsule in Liverpool: A PRIORITY Scan of the 3rd symmetric capsule 288keV 374keV 662keV

  12. Pulse-Shape Analysis: current status Results from the analysis of an in-beam test with the first triple module, e.g. Doppler correction of gamma-rays using PSA results d(48Ti,p)49Ti, v/c ~6.5% Results obtained with Grid SearchPSA algorithm (R.Venturelli et al.) Position resolution ~4.4mm Many different methods are under development Implementation decision?

  13. First production digitizer at Daresbury AGATA Digitiser Module36+1 channels, 100 MhZ, 14 bits(Strasbourg - Daresbury – Liverpool) • Mounted close to the Detector 5-10 m • Power Dissipation around 400W • Water Cooling required • Testing in Liverpool • (December 2006) • Production in progress • (for 18 modules) Prototype Segment Board (2 boards per crystal)

  14. Pre-processing modules (E,T, hits, …) ATCA standard : “full mesh” communication with Gbit Ethernet or PCIexpress switches • Prototypes tested in 2006 • Core digitizer to core mezzanine and carrier communication errors • Redesign of carrier (from Nov06) • Redesign of mezzanines (from Dec06) • New cards under test • Good results so far 1 ATCA crate for 2 clusters(6 Ge crystals, 222 channels)

  15. Timescales for the AGATA demonstrator • Six years research and development phase of AGATA • Start January 2003 ― End December 2008 • First three symmetric Ge crystals delivered in 2004 • First triple module tested in-beam in summer 2005 • Two symmetric crystals scanned for PSA by end 2006 • First electronics prototypes delivered in summer 2006 • Five asymmetric Ge crystals delivered by end 2006 • First scan of asymmetric crystals planned autumn 2007 • First AGATA triple module ready by autumn 2007 • Second generation electronics prototypes by autumn 2007 • Commissioningof first full electronics chain in spring 2008 • Commissioning of sub array at Legnaro from autumn 2008

  16. Status and Evolution • First physics campaign at LNL in 2009 • Next campaigns at GANIL then GSI • MoU for AGATA construction from 2008 • Aim 1p in possible in ~2011 • Rate of construction depends on production capability and financing • Stages of physics exploitation, facility development

  17. More Information AGATA web page http://www.gsi.de/agata/ Talks from last AGATA week ORSAY January 2007 http://www.csnsm.in2p3.fr/groupes/strucnuc/AGATAWEEK/agataweek.html

  18. The Management

  19. Thanks