Our Approach to System Engineering and Our Major Issues. Dan Farris Titan. Customer Requirements. Operate a GOCO for depot support AF Customer changed from Integrated Logistics Support to Systems Engineering model ISC2 Contract TSPR like ESC required use of RTM

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Our Approach to System Engineering and Our Major Issues ' - daniel-mullen


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Customer requirements
Customer Requirements

  • Operate a GOCO for depot support

  • AF Customer changed from Integrated Logistics Support to Systems Engineering model

  • ISC2 Contract TSPR like

  • ESC required use of RTM

  • ESC now requires CMMI Level 3 for contractors and major subs


Organization
Organization

  • System Engineering

    • Systems Engineering & Architecture Section

    • Engineering

    • Computer/Network/Software

    • CADD

    • System Technical Support

  • Project Control

  • Test and Evaluation

  • System Support

    • PDM

    • Tech Shop

  • Business Support


History
History

  • Bottoms Up Approach (2000)

    • Original efforts around EIA 731

    • Level One and declining

  • Top down only with ESC mandate (2004)


Challenges
Challenges

  • Management luke warm to systems engineering

  • Resources, including time, not provided

  • Cash flow crunch eliminated Systems Engineering & Architecture Section

  • CMMI Level 3 under discussion now

  • Systems Engineers transferred to different group


Accomplishments
Accomplishments

  • Developed Requirements Management Function

  • Developed Trade Study standard process

  • Began linking systems engineering with project management

  • Began requirements gathering at project beginning

  • Began linking requirements to testing


Disappointments
Disappointments

  • Lack of desire to work towards CMM principles