Our Approach to System Engineering and Our Major Issues

Loading in 2 Seconds...

play fullscreen
1 / 7

Our Approach to System Engineering and Our Major Issues - PowerPoint PPT Presentation


  • 132 Views
  • Uploaded on

Our Approach to System Engineering and Our Major Issues. Dan Farris Titan. Customer Requirements. Operate a GOCO for depot support AF Customer changed from Integrated Logistics Support to Systems Engineering model ISC2 Contract TSPR like ESC required use of RTM

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Our Approach to System Engineering and Our Major Issues ' - daniel-mullen


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
customer requirements
Customer Requirements
  • Operate a GOCO for depot support
  • AF Customer changed from Integrated Logistics Support to Systems Engineering model
  • ISC2 Contract TSPR like
  • ESC required use of RTM
  • ESC now requires CMMI Level 3 for contractors and major subs
organization
Organization
  • System Engineering
    • Systems Engineering & Architecture Section
    • Engineering
    • Computer/Network/Software
    • CADD
    • System Technical Support
  • Project Control
  • Test and Evaluation
  • System Support
    • PDM
    • Tech Shop
  • Business Support
history
History
  • Bottoms Up Approach (2000)
    • Original efforts around EIA 731
    • Level One and declining
  • Top down only with ESC mandate (2004)
challenges
Challenges
  • Management luke warm to systems engineering
  • Resources, including time, not provided
  • Cash flow crunch eliminated Systems Engineering & Architecture Section
  • CMMI Level 3 under discussion now
  • Systems Engineers transferred to different group
accomplishments
Accomplishments
  • Developed Requirements Management Function
  • Developed Trade Study standard process
  • Began linking systems engineering with project management
  • Began requirements gathering at project beginning
  • Began linking requirements to testing