Delay Attribution Guide April 2011 Changes Preloader

Delay Attribution Guide April 2011 Changes - PowerPoint PPT Presentation


  • 213 Views
  • Uploaded on

1ST MARCH 2011. 2. New Codes. 4 new codes have been introduced to the April 2011 Delay Attribution Guide (DAG). 1ST MARCH 2011. 3. XO Delay Code reasoning. The new XO delay code has been introduced to reduce the use of XZ (generic external) for certain events such as:-Trees falling from outside railway boundaries Masonry / buildings (non railway) falling or threatening to fall onto the infrastructure Motor Vehicles landing on infrastructure Air borne

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Delay Attribution Guide April 2011 Changes' - dani


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ad